Laserfiche WebLink
<br />,.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />separate feed system to accurately proportion the required quantity of hydrated lime into <br />the mixture in such a manner that uniform coating of the aggregate is obtained prior to the <br />addition of the asphalt rubber. Add the hydrated lime in such a manner that it will not <br />become entrained in the exhaust system of the drier or plant. Interlock the proportioning <br />device with the aggregate feed or weigh system to maintain the correct proportions for all <br />rates of production and batch sizes and to ensure that all mixture produced is properly <br />treated with hydrated lime. Control the proportion of hydrated lime to within plus or minus <br />10% of the amount of hydrated lime required. Provide and interlock flow indicators or <br />sensing devices for the hydrated lime system with plant controls so that the mixture <br />production will be interrupted if introduction of the hydrated lime fails. The addition of the <br />hydrated lime to the aggregate may be accomplished by Method (A) or (B) as follows: <br />337-9.2.1 Method (A) - Dry Form: Add hydrated lime in a dry form to the <br />mixture according to the type of asphalt plant being used. <br />When a batch plant is used, add the hydrated lime to the aggregate in <br />the weigh hopper or as approved and directed by the Engineer. Increase the batch dry <br />mixing time by eight to twelve seconds, or as directed by the Engineer, from the time the <br />aggregate is completely emptied into the pug mill. Uniformly distribute the hydrated lime <br />prior to the addition of asphalt rubber into the pugmill. <br />When a drum-mix plant is used, add and uniformly disperse the <br />hydrated lime to the aggregate prior to the addition of the asphalt rubber. Add the hydrated <br />lime in such a manner that it will not become entrained in the exhaust system of the drier <br />or plant. <br />337-9.2.2 Method (B) - Hydrated Lime/Water Slurry: Add the required <br />quantity of hydrated lime (based on dry weight) in a hydrated lime/water slurry form to the <br />aggregate. Provide a solution consisting of hydrated lime and water in concentrations as <br />directed by the Engineer. Use a plant equipped to blend and maintain the hydrated lime in <br />suspension and to mix it with the aggregates uniformly in the proportions specified. <br />337-9.3 Hydrated Lime Pretreatment: For FC-5 mixes containing granite, as an <br />alternative to 337-10.2, pretreat the aggregate with hydrated lime prior to incorporating <br />the aggregate into the mixture. Use a feed system to accurately proportion the aggregate <br />and required quantity of hydrated lime, and mix them in such a manner that uniform <br />coating of the aggregate is obtained. Control the proportion of hydrated lime to within <br />:t 10% of the amount required. Aggregate pretreated with hydrated lime in this manner <br />shall be incorporated into the asphalt mixture within 45 days of pretreatment. <br />337-9.3.1 Hydrated Lime Pretreatment Methods: Pretreat the aggregate <br />using one of the following two methods: <br />Pretreatment Method A - Dry Form: Add the required quantity of <br />hydrated lime in a dry form to the aggregate. Assure that the aggregate at the time of <br />preteatment contains a minimum of 3% moisture over saturated surface dry (SSD) <br />conditions. Utilize equipment to accurately proportion the aggregate and hydrated lime and <br />mix them in such a manner as to provide a uniform coating. <br />Pretreatment Method B - Hydrated Lime/Water Slurry: Add the <br />required quantity of hydrated lime (based on dry weight) in a hydrated lime/water slurry <br />form to the aggregate. Provide a solution consisting of hydrated lime and water in a <br />concentration to provide effective treatment. Use equipment to blend and maintain the <br />hydrated lime in suspension, to accurately proportion the aggregate and hydrated <br />lime/water slurry, and to mix them to provide a uniform coating. <br /> <br />..., <br />. <br /> <br />1"'1 <br />. <br /> <br />,., <br />. <br /> <br />1"'1 <br />. <br /> <br />n <br />. <br /> <br />I' <br /> <br />. <br /> <br />., <br />. <br /> <br />,., <br />. <br /> <br />r"l <br /> <br />. <br /> <br />1"1 <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />,., <br /> <br />. <br /> <br />,..., <br /> <br />. <br /> <br />. <br /> <br />.... <br /> <br />09/09 <br /> <br />01000-78 <br /> <br />03-4122.F <br /> <br />. <br />