My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,..., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />338 VALUE ADDED ASPHALT PAVEMENT. <br />(REV 2-25-05) (FA 6-21-05) (1-06) <br /> <br />..., <br />. <br /> <br />PAGE 278. The following new Section is added after Section 337. <br /> <br />,., <br />. <br /> <br />SECTION <br />VALUE ADDED ASPHALT PAVEMENT <br /> <br />338 <br /> <br />..., <br />. <br /> <br />338-1 Description. <br />Construct Value Added Asphalt Pavement consisting of Asphalt Concrete Structural <br />Course and Asphalt Concrete Friction Course, subject to a three year warranty period. <br />For purposes of this Specification, Warranty" shall mean the Responsible Party, as <br />designated herein, is responsible for performance of the Value Added Asphalt Pavement for <br />a period of three years after final acceptance of the Contract in accordance with 5-11, <br />including continued responsibility for performing all remedial work associated with <br />pavement distresses exceeding threshold values determined in accordance with 338-5, and <br />as to which notice was provided to the Responsible Party within the three-year warranty <br />period. <br />The work specified in this Section will not be paid for directly, but will be <br />considered as incidental to other asphalt pay items. <br /> <br />., <br />. <br /> <br />"1 <br />. <br /> <br />r"'l <br />. <br /> <br />.., <br />. <br /> <br />338-2 Materials and Construction Requirements. <br />Meet the requirements of the following: <br />Hot Bituminous Mixtures - Plant, Methods and Equipment...... Section 320 <br />Hot Bituminous Mixtures - General Construction Requirements Section 330 <br />Superpave Asphalt Concrete.............................................. Section 334 <br />Asphalt Concrete Friction Courses...................................... Section 337 <br /> <br />,.., <br /> <br />. <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />338-3 Responsible Party. <br />Prior to any Value Added Asphalt Pavement being placed on the project, the <br />Contractor shall designate a Responsible Party to accept responsibility for maintaining the <br />Value Added Asphalt Pavement, when remedial work is required. When the scope of the <br />asphalt work is only milling and resurfacing, and there is no construction of the <br />embankment, subgrade or base below the pavement included in the Contract, the <br />Responsible Party may be either the Contractor or the Department approved subcontractor <br />performing the Value Added Asphalt Pavement work. When the construction of the <br />embankment, subgrade or base below the pavement is included in the Contract, in addition <br />to the construction of the Asphalt Concrete Structural Course and Asphalt Concrete <br />Friction Course, the Contractor shall be considered as the Responsible Party. <br />When the Responsible Party is a subcontractor, the subcontractor must be pre- <br />qualified with the Department in the category of asphalt, and such designation must be <br />made to the Department by the Contractor. The proposed subcontractor must execute and <br />deliver to the Department a form, provided by the Department, prior to or concurrent with <br />the Contractor's request to sublet any Value Added Asphalt Pavement work, stipulating <br />that the subcontractor assumes all responsibility as the. Responsible Party for the Value <br />Added Asphalt Pavement within the three-year warranty period. Failure to timely designate <br />the Responsible Party will result in the Contractor being the Responsible Party unless <br />otherwise agreed to in writing by the Department. <br /> <br />,., <br />. <br /> <br />,., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />..., <br />. <br /> <br />1"'1 <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />09/09 <br /> <br />01000-81 <br /> <br />03-4122.F <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.