Laserfiche WebLink
<br />- <br /> <br />. <br /> <br />..., <br /> <br />.., <br /> <br />Responsible Party. Remedial work performed by other forces does not alter any of the <br />requirements, responsibilities or obligations of the Responsible Party. <br />The Responsible Party must complete all remedial work to the satisfaction of <br />the Engineer. Any disputes regarding the adequacy of the remedial work will be resolved <br />by the Statewide Disputes Review Board. Approval of remedial work does not relieve the <br />Responsible Party from continuing responsibility under the provisions of this Specification. <br />Notify the Engineer in writing prior to beginning any remedial work. Meet the <br />requirements of the Department's Standard Specifications for Road and Bridge <br />Construction and implemented modifications thereto when performing any remedial work. <br />Perform all signing and traffic control in accordance with the current edition of the <br />Department's Design Standards for Design, Construction, Maintenance and Utility <br />Operations on the State Highway System. Provide Maintenance of Traffic during remedial <br />work at no additional cost to the Department. Lane closure restrictions listed in the original <br />Contract will apply to remedial work. Written request(s) to obtain permission for lane <br />c1osure(s) for either forensic investigation or remedial work must be made to the Engineer <br />48 hours in advance of any lane closures. Do not perform any lane closures until written <br />permission is given by the Engineer. <br />If remedial work necessitates a corrective action to overlying asphalt layers, <br />pavement markings, signal loops, adjacent lane(s), roadway shoulders, or other affected <br />Contract work, perform these corrective actions using similar products at no additional <br />cost to the Department. <br /> <br />. <br /> <br />. <br /> <br />r"1 <br />. <br /> <br />f'1 <br />. <br /> <br />r"1 <br />. <br /> <br />" <br />. <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />338-6 Responsible Party's Failure to Perform. <br />Should the Responsible Party fail to timely submit any dispute to the Statewide <br />Disputes Review Board, fail to satisfactorily perform any remedial work, or fail to <br />compensate the Department for any remedial work performed by the Department and <br />determined to be the Responsible Party's responsibility in accordance with this <br />Specification, the Department will suspend, revoke or deny the Responsible Party's <br />certificate of qualification under the terms of Section 337.16(d)(2), Florida Statutes, for a <br />minimum of 6 months or until the remedial work has been satisfactorily performed (or full <br />and complete payment for remedial work performed by others made to the Department), <br />whichever is longer. Should the Responsible Party choose to challenge the Department's <br />notification of intent for suspension, revocation or denial of qualification and the <br />Department's action is upheld, the Responsible Party will have its qualification suspended <br />for an additional minimum of 6 months. <br />The remedial work is not an obligation of the Contractor's bond required by Section <br />337.18, Florida Statutes. <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />r-1 <br /> <br />. <br /> <br />.., <br />. <br /> <br />r-1 <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />..., <br />. <br /> <br />,.., <br />. <br /> <br />.., <br />. <br /> <br />..., <br />. <br /> <br />09/09 <br /> <br />01000-87 <br /> <br />03-4122.F <br />