Laserfiche WebLink
<br />() <br />rt <br />fl <br />() <br />~ <br />() <br />(t <br />~ <br />. <br />.. <br /> <br />'" <br />... <br />-.... <br />., <br />""'" <br />.., <br />~ <br />.. <br /> <br />. <br />l <br />. <br />... <br />~. <br />..) <br />:) <br />l <br />t <br />'t <br />") <br />) <br />. <br />) <br />.... <br />) <br />. <br />) <br />t <br />t <br />:) <br />~ <br />. <br />...... <br />.. <br />-.. <br />., <br /> <br />PSE PIOS & SONS <br /> <br />~ Sunny Isles, Florida <br />(305) 919-9662 <br /> <br />Project TimeJine Synopsis <br /> <br />The project can reasonable be expected to be 95% completed within 65 days of the notice to proceed assuming <br />no extraordinary weather conditions. The following is a specific task oriented timeline for the removal, <br />fabrication and installation of the replacement signs for the existing street signs west of Collins A venue from <br />174111 Street to 193rd Street. <br /> <br />Day 1: <br /> <br />. Contract Execution. <br /> <br />. Notice to Proceed. <br /> <br />· Complete detailed identification and list of signs the City wishes to have removed and replaced. <br /> <br />Days 2- 40: <br /> <br />· Fabrication of entire sign assemblies. <br />· Underground utility locations to be identified to ensure there is no conflict of new sign location. <br />· Verification of new sign locations to be done in conjunction with the City project administrator. <br /> <br />Days 41-65 <br /> <br />· Installation of new decorative signs. <br />· Removal and delivery of old sign assemblies to a designated location provided by the city. <br />· Field inspection of signs to be done by the City. <br /> <br />... <br /> <br />. <br />- <br />., <br />...... <br />.., <br />~ <br />.. <br />"'\. <br />.. <br />....., <br /> <br />Pios and Sons Enterprises, Inc. <br />320 Atlantic Avenue, Sunny Isles, FL 33160 <br />OFFICE: (305) 919-9662 FAX: (305) 819-4222 PIOS@BELLSOUTH.NET <br />