Laserfiche WebLink
<br />GRAPH_rim <br />SIGNAGE <br /> <br />< Timeline > <br /> <br />Similar to the Golden Shores area, GP will begin fabrication once the contract has been <br />signed. The fabrication process will take approximately two months. <br /> <br />We will remove the existing signs in sections (determined by your office; if requested) <br />and dig holes with an auger. In the past, we installed roughly 16 sign units per day. The <br />new sign units will be installed within one month of the installation commencement. The <br />auger crew will remove the signs for the week and dig the holes at the same time. GP will <br />create a base plate to hold the previous sign in place. Shortly after the removal, we will <br />install the new, permanent sign. The base plate will hold the old, previous sign in place as <br />a place holder for the installers. That way, the exact signs are installed in the location in <br />the same position. <br /> <br />The previous signs will be delivered to the underbelly of the William Lehman Causeway. <br /> <br />2301 NORTH 21ST AVENUE, HOllYWOOD, Fl33020 954.549,5566 FAX 954.920.0906 jack@graphplex.com www.graphplex.com <br />