Laserfiche WebLink
<br />I <br /> <br />1111 I~E~ft~ <br /> <br />MAHMOOD DAVOODI <br />Construction Manager <br /> <br />I <br /> <br />.., <br />I <br /> <br />EDUCATION: <br />B.S, in Construction Engineering Technology - Florida International University. <br /> <br />-, <br />I <br /> <br />CERTIFICATIONS: <br />Certified General Contractor CGC#1517704 <br /> <br />'l <br />. <br /> <br />SUMMARY OF EXPERIENCE: <br />Over 20 years of construction management experience. <br /> <br />., <br />. <br /> <br />PROJECT EXPERIENCE: <br /> <br />I <br /> <br />April 2007 to Present <br /> <br />Griffin Road Project <br />Milling and resurfacing, and reconstruction of Griffm Road from two lanes rural to four lanes divided highway with medina <br />separator. The project includes construction of new bridge, roadway lighting, signalization and sidewalk construction from 1- <br />75 to Flamingo Road in Broward County, Fl. <br /> <br />., <br />I <br /> <br />I <br /> <br />July 2005 to April 2007 <br /> <br />Broward Boulevard Project <br />Widening and increase capacity of turn lanes, roadway lighting, signalization upgrades and sidewalk construction. This project <br />also includes construction of bulkhead wall and railing along the canal bank and new bridge culvert and realignment of 70th <br />Avenue in Plantation, Fl. <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />October 2003 to July 2005 <br /> <br />Griffin Road Project from Palm Ave to Flamingo Road. <br />Widening of the existing two-lane road to a six lane urban typical section through a busy business corridor in Cooper City, Fl. <br />Construction includes asphalt pavement, drainage, signalization, sidewalk and curb and gutter. Project also includes <br />construction of seawall along C-ll canal. <br /> <br />I <br /> <br />., <br />. <br /> <br />November 2001 to January 2003 <br />Griffin Road Widening and Reconstruction <br />Griffin Road project from East of University Drive to Palm Avenue/lOO Avenue. Construction includes new bridge <br />structure, drainage, pre-cast noise walls, signalization and lighting. <br /> <br />May 2000 to October 2001 <br />SR-838/Sunrise Blvd. <br />Milling and resurfacing, and median modifications to Sunrise Boulevard from University Drive to NW 56th Avenue. The <br />project includes widening, roadway lighting, signalization upgrades, sidewalk construction and landscaping. <br /> <br />I <br /> <br />r"'1 <br />. <br /> <br />r"l <br />. <br /> <br />September 1999 to May 2000 <br />Griffin Road Widening and Reconstruction Project <br />Widening and reconstruction of Griffin Road from SR-7 to University Drive. The project involved reconstruction of Griffm <br />Road from two lanes to a six lane divided highway, construction of three bridges on Griffin Road and SR-7, installation of <br />mast arm signalization, landscaping, irrigation system and new storm drainage system. <br /> <br />,., <br />I <br /> <br />., <br />. <br /> <br />March 1999 to September 1999 <br />University Drive at Southgate Boulevard <br />Bridge and roadway widening, milling and resurfacing of University Drive at Southgate Boulevard, The bridge work included <br />the widening of the existing bridge piers, removing and replacing precast slabs, and post-tensioning the bridge deck. <br /> <br />-, <br /> <br />. <br /> <br />Tenex Enterprises, Inc,. .850 SW 14th Court, Pompano Beach, FL · Phone: (954) 788-8100. Fax (954) 788-0005 <br />