My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Spohn Ranch
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-11-01 Prof. Design & build svcs. for skateboard park
>
Responses
>
Spohn Ranch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 4:33:39 PM
Creation date
5/12/2011 4:27:25 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design & Build svcs for skateboard park
Bid No. (xx-xx-xx)
09-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.... <br />. <br /> <br />,.., <br />. <br /> <br />4. Schedule <br /> <br />..., <br />. <br /> <br />I <br /> <br />The following is a sample schedule based on a January 13th notice to proceed. Because of our use of pre- <br />engineered skate elements, the permitting and approval process is typically much shorter than traditional <br />poured-in-place construction. <br /> <br />I <br /> <br />We were able to complete our recent skatepark design/build projects for Miami-Dade County on a very short <br />schedule with a smooth permitting and approval process due to our experienced compliance officer and the <br />quality of our supporting documents. <br /> <br />I <br /> <br />,., <br />I <br /> <br />Depending on the agency compliance required by the sidewalk widening along Collins Ave., this schedule may <br />be adapted. <br /> <br />"1 <br />. <br /> <br />The schedule also incorporates two public meetings conducted a Spohn Ranch Community Involvement <br />expert to insure maximum buy-in by a stakeholders, including the owners and residents of the condominium <br />building directly to the north of the park. <br /> <br />r'I <br />. <br /> <br />Notice to Proceed - <br />First Team Meeting- <br />First Meeting with County- <br />First Public Meeting- <br />Second Meeting with County- <br />Second Public Meeting - <br />Third Meeting with County- <br />Construction Documents Completed - <br />Permitting & Approvals Obtained - <br />Construction Begins - <br />Construction Complete - <br /> <br />,.., <br />. <br /> <br />"'1 <br />. <br /> <br />'1 <br />. <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />,., <br />. <br /> <br />..., <br />I <br /> <br />,.., <br />. <br /> <br />., <br />. <br /> <br />January 11th, 2009 <br />th <br />January 12 , 2009 <br />th <br />January 14 ,2009 <br /> <br />January 15th, 2009 (Concept designs presented) <br /> <br />February 4th, 2009 <br /> <br />February 5th, 2009 (Final design presented) <br /> <br />February 25th, 2009 <br />b th <br />Fe ruary 26 , 200 <br />March 15th, 2010 <br /> <br />April 15\ 2010 <br /> <br />May 155t, 2010 <br /> <br />15131 Clark Ave. -Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com <br /> <br />9 <br /> <br />r"1 <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.