My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Spohn Ranch
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-11-01 Prof. Design & build svcs. for skateboard park
>
Responses
>
Spohn Ranch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 4:33:39 PM
Creation date
5/12/2011 4:27:25 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design & Build svcs for skateboard park
Bid No. (xx-xx-xx)
09-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.l <br />. <br /> <br />I <br />I <br />I <br />I <br /> <br />3. Estimated Cost Ranges <br /> <br />Spohn Ranch will alter the below fee proposal to incorporate any in-kind services or materials acquired <br />by the City. <br /> <br />We have presented a base bid that covers the main scope requested by the City through the bid <br />documents, the pre-bid meeting and subsequent addendums. We are able to adapt our scope and <br />approach to incorporate any job items required by the city. <br /> <br />'1 <br />. <br /> <br />Estimated Project Line Items <br /> <br />I <br /> <br />Turnkey Construction of ~5200 sq. ft. Skatepark <br /> <br />Concrete Flatwork <br /> <br />$40,000 <br />$100,000 <br />$70,000 <br /> <br />Site Preparation <br /> <br />r'l <br />. <br /> <br />Concrete Skate Element Construction <br /> <br />I <br /> <br />Total Skatepark Construction Fees <br /> <br />$210,000 <br /> <br />~ <br />. <br /> <br />Landscape Architect Fees <br /> <br />$85,000 <br />$5,000 <br />$35,000 <br />$7,500 <br />$10,000 <br />$7,500 <br /> <br />Pavers (with Curvilinear design) supplied and installed on Collins Ave. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />New Entrance at NE corner of park <br /> <br />New Plaza Entrance at SE corner of park <br /> <br />Civil Engineering Fees <br /> <br />Stamped Construction Drawings <br /> <br />Optional Line Items <br /> <br />Fourteen (14) Medjool Date Palms (3 at new SE Plaza & 11 along Collins Ave.) <br /> <br />$45,000 <br />$35,000 <br /> <br />r"1 <br />lIIIi <br /> <br />Twenty-eight (28) In-Ground Up-Lights for Date Palms <br />Street Lighting along Collins Ave. (per installed light) <br /> <br />$20,000 each <br /> <br />,., <br /> <br />Integrated Lighting in Skate Elements <br /> <br />$15,000 <br />$10,000 <br /> <br />. <br />. <br /> <br />Landscaping at new SE entrance <br /> <br />., <br />. <br /> <br />7 <br /> <br />15131 Clark Ave. -Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com <br /> <br />..., <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.