My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Korkat, Inc
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-11-01 Prof. Design & build svcs. for skateboard park
>
Responses
>
Korkat, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 4:31:25 PM
Creation date
5/12/2011 4:31:25 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design & Build svcs for skateboard park
Bid No. (xx-xx-xx)
09-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />8. Warranty <br /> <br />Damon Spohn, VP of Design & Engineering - Spohn Ranch Skateparks <br />Damon Spohn is VP of the design and engineering divisions of Spohn Ranch, Inc. In <br />addition to being a licensed California general contractor, he is an expert with <br />Mechanical Desktop and AutoCAD. He prepares the layouts and coordinates the <br />permitting and stamping of construction documents for our skatepark projects. <br /> <br />A skatepark designer for over 10 years, Damon has created concepts, final designs, <br />and construction drawings for many high profile skateparks across the country. The <br />inventor of many oftoday's standard skatepark elements, Damon keeps his designs <br />current with ongoing skating, research, and collaboration with today's top skaters. <br /> <br />David Tripoli, Cost Estimator - Spohn Ranch Skateparks <br />David brings 14 years of cost estimating experience to his current position at Spohn <br />Ranch. For 10 years, he was a senior estimator for ValleyCrest - one of the nation's <br />largest contractors. <br />He's an expert at estimating site work costs, assessing materials and construction <br />methods, as well as performing quality control to insure that all proposed work <br />meets applicable standards. <br /> <br />Spohn Ranch will provide a 15-year limited warranty on all pre-cast skate elements installed. This means <br />that the most specialized, expensive elements of the project will receive the maximum protection. This <br />warranty replaces any defective pieces for the first 15-years of the park's life. During the first 5-years, <br />these replacements will be completely free to the city with Spohn Ranch bearing all costs. In the <br />ensuing 10-years, the only cost the city will bear will be the labor to install the pieces. <br /> <br />All other flatwork and hardscape will be protected by a i-year guarantee of work. <br /> <br />The expected lifespan of the pre-cast skate elements is 50 years with virtually no required maintenance. <br />Because the pre-cast elements are insulated from ground by an air cavity, the riding surface of the park <br />is not affected by changes in the underlying soil. This is particularly important given the mangrove area <br />adjacent to the park. During the wet season, the soil beneath the park may expand with moisture. This <br />will stress a traditional poured-in-place concrete park and will lead to cracking and weeping of water <br />through the cracks. <br /> <br />Another factor that will expand the lifespan of Sunny Isles' park is proper use of metal edging. <br />Traditional poured-in-place construction struggles to properly integrate metal edging along the <br />grindable surfaces. This is why these traditional designers often use curving and sweeping forms instead <br />of the right angles that skaters prefer. By incorporating steel edging into the mold during casting, the <br /> <br />15131 Clark Ave. - Industry, CA 91745 - P 626-330-5803 x203 - f 626-330-5503 - Kirsten@spohnranch.com <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.