My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kalex Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-11-01 Prof. Design & build svcs. for skateboard park
>
Responses
>
Kalex Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 10:44:08 AM
Creation date
5/12/2011 4:32:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design & Build svcs for skateboard park
Bid No. (xx-xx-xx)
09-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Request for Proposal No. 09-11-01 <br />DESIGN-BUILD SERVICES FOR <br />SKATE BOARD PARK AT TOWN CENTER <br /> <br />Design I Construction Overview & Materials <br />Project Warranty <br /> <br />The Skate Board Park @ Town Center is intended to be a gathering place for residents and kids to experience <br />skate boarding at the beginning level and allow people the opportunity to learn and have fun and the same <br />time. <br /> <br />Our team envisions incorporating sustainable components into the facility that will not only enhance the look of <br />the park but also lead by example in creating a park that incorporates as many sustainable materials as possi- <br />ble while maintaining the integrity of the city's budget. A separate entrance will be developed from the east side <br />of the park off of Collins Avenue that will allow separation from the main park area. This entrance will also incor- <br />porate a small kiosk area where the city can monitor the use of the park as well as crate an entrance to the <br />skating experience. Our design will also incorporate re-designing the SE corner of the park to allow both sides <br />to work as one park. The incorporation of street art, which is manufactured by Team Pain will give the corner a <br />sense of color and creativity that will enhance the look of the park. <br /> <br />Sustainable Design: <br />Selected use of graphics, materials such as wood, steel, corrugated metal and acid stained concrete <br />allow for sustainability and an aesthetically exciting park and kiosk structure. By working hand in hand <br />with the skate park designer, we hope to bring the sense of movement and excitement generated by the <br />flowing curves of the skate park into the overall landscape and design of the small structure/s, <br />Our use of existing fill that may be generated to create some of the changes in elevations will also allow <br />us to minimize the disturbance of existing areas and minimize transportation costs. <br /> <br />We will maintain a high level of protection for the environmentally sensitive areas just south of the pro- <br />posed skate park area by installing silt fencing and maintain all Department of Environmental Protec- <br />tion regulations. <br /> <br />Our plan will incorporate a series of water fountains and lights that are directed down and work with <br />cut-off sensors in order to minimize to effects of light pollution, <br /> <br />Landscaping will incorporate fully native plants through color and type, while maximizing its xeriphic <br />qualities, Emphasis of canopy trees for shade supplemented by palms to highlight circulation patterns <br />and spatial elements We will maximize the use of local recycled materials and absorbing elements <br />added to the planting soil for additional water retention and water conservation, <br /> <br />Warranty: <br />Team Pain offers a one year warranty against defects in workmanship provided by Team Pain and is related to <br />the actual skating surfaces and accessories. The surface of the skate park will maintain its integrity and Team <br />Pain will warranty the repair of any shifting or heaving of the concrete, the metal edges (coping) are to remain <br />secure and in-tact, as well as, any welding work performed. <br /> <br />In addition to Team Pain's warranty Kalex Construction and all sub-contractors used will offer a one year war- <br />ranty on all construction related work performed. Any additional manufacturer's warranty on installed products <br />will be added to a close-out package that is submitted to the City of Sunny Isles upon completion of the project. <br /> <br />~I <br />=. <br />- <br />KALEX <br /> <br />[T1.Ei\~ ~~~~J <br /> <br />SILV,4 N<CHifECTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.