My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kalex Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-11-01 Prof. Design & build svcs. for skateboard park
>
Responses
>
Kalex Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 10:44:08 AM
Creation date
5/12/2011 4:32:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design & Build svcs for skateboard park
Bid No. (xx-xx-xx)
09-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />KALEX <br /> <br />CONSTSTRUCTION & DEVELOPMENT. INC. <br />CONSTRUCTION MANAGERS I DESIGN BUILDERS <br />6340 NW 77th Court I Miami, Flonda 33166 <br />P: 305-513-8484 I F: 305-513-8481 <br /> <br />CITY OF SUNNY ISLES BEACH - SKATEBOARD PARK@TOWN CENTER (PROPOSED SCHEDULE) <br /> <br />Pro 'eel Awarded <br />Contract Procurement <br />Design Phase <br />Mobilize & Clearin <br /> <br /> <br />DESIGN <br /> <br />Skale Park Const. <br /> <br />Flatwork & CO <br /> <br />Description of Work <br /> <br />10 11 12 13 14 15 16 <br /> <br />7-8 Weeks <br /> <br />5-6 Weeks <br /> <br />commencement <br /> <br />Design Phase allocated 3 weeks, <br /> <br />Prepare Area For Flat Work <br /> <br />permitting and approvals 2 weeks. All lead <br /> <br />Skate Park Construction <br />UG Draina e <br />UG Electric I Plumb. <br /> <br />5-weeks <br /> <br />time items being procured,skate park <br /> <br />Kiosk Construction <br /> <br /> <br />design is finalized. <br /> <br />Work on Collins Ave. could run <br /> <br />Com lete all Flat Wor!< <br />Install Li ht Poles <br />Install Finishes <br />Pour Sidewalks <br />Install Landsca in I Restoration <br /> <br />concurrent with skate park. upon <br /> <br />permit approvals <br /> <br />2-3 Weeks <br /> <br />Complete SE Entrance Area <br /> <br />FINAL INSPECTIONS FOR THE ENTIRE PROJECT WOULD TAKE PLACE AT OR BEFORE WEEK-16 <br />PROJECT TIME WOULD BE APX 120 DA YS TO SUBSTANTIAL COMPLETION <br />UPON REVIEW AND APPROVAL OF CONSTRUCTION DOCUMENTS. <br /> <br />NOTES: <br /> <br />THERE WOULD BE CROSSING <br />OF PHASES DURING DESIGN <br />AND MOBILIZATION. THE <br />INTENTION WOULD BE TO <br />FENCE OFF THE ENTIRE <br />NORTH SIDE AND ALLOW PARK <br />USE DURING CONSTRUCTION <br /> <br />SITE ACCESS WOULD COME <br />OFF OF COLLINS AVE. ANY <br />DAMAGE TO SIDEWALK, FENCE <br />ETC... WOULD BE RESTORED. <br /> <br />CITY OF SUNNY ISLES BEACH <br />SKATEBOARD PARK @ TOWN CENTER <br /> <br />SKATE PARK COMPONENT <br />WOULD RUN CONCURRENT <br />WITH SITE WORK ON THE EAST <br />SIDE <br /> <br />SE CORNER ENTRANCE <br />WOULD BE THE FINAL PHASE <br />OF PROJECT AND TURNED <br />OVER UPON COMPLETION OF <br />SKATE PARK <br />
The URL can be used to link to this page
Your browser does not support the video tag.