My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Castle USA Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-04-02 Canopy for Heritage Park
>
Responses
>
Castle USA Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2011 11:35:05 AM
Creation date
5/25/2011 11:34:54 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design, Fabrication & Inst. of Canopy at Heritage Park
Bid No. (xx-xx-xx)
11-04-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />. <br /> <br />r"'1 <br /> <br />Castle USA Corp. <br /> <br />Florida Certified General Contractors - Licenses QB-58365, CGC1514321 <br />Certifications Miami Dade County CSBE-12256, EPA NAT-109738-1 <br />Main address 3321 NW 82 Ave. Doral, Fl33122 Mail Address: 5620 NW 113 Pl, Doral, Fl33178 <br />Ph: 305-303-9191 Fax: 305-513-8342 castleusa@bellsouth.net <br /> <br />,..... <br /> <br />. <br /> <br />. <br /> <br />M <br /> <br />. <br /> <br />. Structural Engin,eering Calculations - Alternative B - Ramms Engineering, Inc. - Proof of DBPR license as <br />Florida Certificated General Contractor. (1 page). <br />. Fabric Awning Subcontractor - Miami Awning Company, Inc. Proof of DBPR license as Florida <br />Certificated General Contractor. (1 page). Proof of Active Corporation with Florida Department of State <br />since June 06, 1997 (2 pages) <br />. Electrical Contractor - Mesa Brothers, Inc. Proof of DBPR license as Florida Certificated General <br />Contractor. (1 page). Proof of Active Corporation with Florida Department of State since May 17, 2000 <br />(2 pages) <br />. Castle USA Corp., certification as Construction Small Business Enterprise for MDC, CSBE # 12256 (1 page) <br />. Certificate USA Corp., certification as EPA renovator under 40 CTR Part 745. <br />. Professional experience of proposed Project Manager and Qualifier for this job. (1 page) <br />. List of references. (1 page) <br /> <br />" <br />. <br /> <br />n <br />. <br /> <br />n <br />. <br /> <br />'1 <br />. <br /> <br />.., <br />. <br /> <br />Specs for this job: <br /> <br />n <br /> <br />. The structure footings will be in 3000 psi reinforced concrete. The columns will be in aluminum <br />structural round pipe 10" nominal diameter and schedule 40. The structural elements next to the back <br />stage will be in 1'2" aluminum plate and pipe 3" nominal diameter, schedule 40. Corner sandwich <br />triangles and turnbuckles will be in 316 stainless. AI the studs, bolts, nuts and washers will be in stainless <br />steel. All the structural elements will be commercial grade, as required by the engineering calculations <br />and shop drawings. <br />. The structure will be electrostatically painted (Powder Coating Systems - By Oven Dry Process) in white <br />or black color, will be chosen and approved by owner as part of the submittal process. <br />. Canopy Fabric - Base proposal - The canopy fabric for the 3 sails will be commercial grade UV resistance, <br />manufactured by Ferrari Textiles, Precontraint Manufactured, and Monocolor line 542. See attached <br />brochure. This is a Shade and Water Proof fabric. The color{s) of the 3 fabric cover triangles or sails will <br />be chosen and approved by owner as part of the submittal process. <br />. Canopy Fabric - Optional - The optional canopy fabric will be commercial grade UV resistance, <br />manufactured by Ferrari Textiles, Solitis 93, and micro-ventilated textile for solar protection. See <br />attached brochure. The color{s) of the 3 fabric cover triangles or sails will be chosen and approved by <br />owner as part of the submittal process. Covered area is approximately 70 % of the stage area. <br />. Price quoted is based on current Florida Building Code regulations. Sails will be designed for 90 mph 3 <br />second gusts. Canopy fabric covers or sails must be removed and carefully storage when advisory of <br />hurricanes (75 mph). Fabric meets with current Fire Code Regulations for Canopies Covers. Castle USA <br />Castle USA will deliver in written, special directives on how to remove the sails. <br />. Stage Area Lighting System - Lighting system will be by Altman. Light fixtures will be Altman Outside <br />Door Par Can Stage Lights 600A Series - 750 Watts, tungsten halogen lamps. Housing in heavy black cast <br />aluminum for maximum durability. See attached technical information sheet. 3 - 4 lights per pole (total <br />of 8 lights). All the cables will be hidden inside of the poles. <br /> <br />. <br /> <br />n <br /> <br />. <br /> <br />r""I <br /> <br />. <br /> <br />.., <br />. <br /> <br />r"1 <br />. <br /> <br />,., <br /> <br />. <br />. <br /> <br />.., <br /> <br />.. <br /> <br />,., <br /> <br />. <br /> <br />M <br /> <br />. <br /> <br />~. <br /> <br />Page 2 of3 <br /> <br />..... <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.