My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Castle USA Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-04-02 Canopy for Heritage Park
>
Responses
>
Castle USA Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2011 11:35:05 AM
Creation date
5/25/2011 11:34:54 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design, Fabrication & Inst. of Canopy at Heritage Park
Bid No. (xx-xx-xx)
11-04-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,., <br />. <br /> <br />.. <br /> <br />CASTLE USA CORP. - ESTIMATE BREAKE DOWN <br />Project Name: Design, Fabrication and installation of Canopy Structure at Heritage Park <br />Project Number: RFP 11-04-02 <br />Project Address: 19300 Collins Ave., Sunny Islands Beach, FL 33160 <br /> <br />,., <br /> <br />.., <br /> <br />. <br /> <br />---------------------------------------- <br /> <br />.., <br />. <br /> <br />Plans I Plans Revisions & Construction Fees: <br />Insurances - Performance Bond & Additional Insured <br />Architectural & Engineering Plans <br /> <br />920 <br />3,700 <br />2,400 <br /> <br />,., <br />. <br /> <br />Construction: <br /> <br />---------------------------------------- <br /> <br />Div 1 General Conditions <br /> <br />n <br /> <br />Div 2 Site Construction <br /> <br />. <br /> <br />Div 3 Concretes <br /> <br />n <br /> <br />III <br /> <br />Div 4 Masonry <br /> <br />Div 5 Metals <br /> <br />.., <br />. <br /> <br />Div 6 Wood and Plastics <br /> <br />Div 7 Thermal and Moisture Protection <br /> <br />n <br /> <br />. <br /> <br />Div 8 Doors and Windows <br /> <br />n <br /> <br />Div 9 Finishes <br /> <br />. <br /> <br />Div 10 Specialties <br /> <br />,., <br /> <br />Div 11 Equipment <br /> <br />. <br /> <br />Div 12 Furnishings <br /> <br />..., <br /> <br />Div 13 Special Construction <br /> <br />. <br /> <br />Div 14 Conveying System <br /> <br />,.., <br /> <br />Div 15 Mechanical <br /> <br />. <br /> <br />Div 16 Electrical <br /> <br />------------------------------------------- <br /> <br />..., <br /> <br />. <br /> <br />Plans Revisions & Construction Fees ( MDC ): <br />Performance Bond & Additional Insured: <br />Architectural & Egineering Plans: <br />General Conditions: <br />Labor Materials & Services: <br />Sub-total: <br /> <br />,., <br /> <br />. <br /> <br />,., <br /> <br />Company Overhead: <br />Company Margin: <br />Sub-total: <br /> <br />. <br /> <br />..., <br /> <br />Contingency: <br />Total Bid: <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />M <br /> <br />. <br /> <br />4,580 <br /> <br />8,726 <br />5,332 <br />N/A <br /> <br />7,319 <br />N/A <br /> <br />N/A <br /> <br />N/A <br /> <br />1,000 <br /> <br />48,210 <br />N/A <br /> <br />N/A <br /> <br />N/A <br /> <br />N/A <br /> <br />N/A <br /> <br />11 , 120 <br /> <br />920 <br />3,700 <br />2,400 <br />4,580 <br />81,707 <br />93,307 <br /> <br />4,665 <br />8,398 <br />106,370 <br /> <br />1,866 <br />108,236 <br /> <br />5.0% <br />9.0% <br /> <br />2.0% <br />
The URL can be used to link to this page
Your browser does not support the video tag.