Laserfiche WebLink
<br /> <br />Addendum No.3 <br /> <br />CITY OF SUNNY ISLES BEACH <br />Stormwater Catch Basin Cleaning <br />CITY RFQ NO. 11-04-03 <br /> <br />To All Bidders: <br /> <br />Bidders for the above-referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br /> <br />~ Request for Information: <br /> <br />. What are the dimensions on the basins? What is the distance between <br />manholes? <br /> <br />Catch basin dimensions vary and should be field verified. As to the distance <br />between manholes it too varies. <br /> <br />I have attached a scan of the stormwater atlas for the City. This atlas <br />includes FOOT ROW which should not be included as part of the proposal. <br /> <br />. Do we have to have the insurance for the bid or if awarded the bid, can we <br />get the insurance within like 5 days? <br /> <br />Insurance requirements must be met upon award. <br /> <br />END OF SECTION <br />