Laserfiche WebLink
<br />with original seals and back-up documentation as necessary for filing at the <br />building department. Proposer shall coordinate the same with the City's <br />Building Department. <br /> <br />. This project is a 100% turn-key project. Proposer shall obtain all necessary permits from <br />all agencies having jurisdiction. Proposer shall include all labor, equipment, and <br />materials to ensure that the project is completed on time and within the cost. <br /> <br />3.2 PROPOSER'S RESPONSIBILITIES <br /> <br />The successful Proposer shall provide all necessary construction services as delineated in this RFP <br />to construct the Bella Vista Bay Park improvements and leave the site and adjacent site impacted <br />by the work in good condition acceptable to the City. At the time of submission of the Proposal, <br />the Proposer shall understand and comply with all Federal, State, County and Local codes, <br />regulations, and ordinances applicable to this project. <br /> <br />Prior to fabrication and/or installation, the successful Proposer shall meet with the city staff to <br />ensure that the proposed design and installation methods are acceptable. The successful <br />Proposer must obtain and pay for all necessary permits. ONLY City fees will be waived. <br /> <br />At the time of construction/installation, successful Proposer must provide all material, labor, <br />equipment, safety measures, and protective devices/control measures to ensure that the project <br />is successfully implemented, executed, and approved by the City of Sunny Isles Beach. <br /> <br />END OF SECTON <br /> <br />PAGE 23 OF 32 <br />BID No, 11-01-01 <br />