My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-05-01 Bella Vista Bay Park Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2011 1:53:05 PM
Creation date
6/17/2011 1:47:03 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Bella Vista Park Improvements
Bid No. (xx-xx-xx)
11-05-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />· the means of access to the site and the accommodations it may require and, in <br />general, shall be deemed to have obtained all information as to risks, <br />contingencies and other circumstances. <br /> <br />The City assumes no responsibility or liability for the physical condition or safety of the <br />Work site or any improvements located on the Work site. The Contractor shall be solely <br />responsible for providing a safe place for the performance of the Work. The City shall not <br />be required to make any adjustment in either the Contract Sum or Contract Time <br />concerning any failure by the Contractor or any Subcontractor to comply with the <br />requirements of this Paragraph. <br /> <br />1.3 Required Provisions Deemed Inserted <br /> <br />1.3.1 Each and every provision of law and clause required by law to be inserted in the Contract <br />shall be deemed to be inserted therein, and the Contract shall be read and enforced as <br />though it were included therein; and if through mistake or otherwise any such provision is <br />not inserted, or is not correctly inserted, then upon the written application of either party <br />the Contract shall forthwith be physically amended to make such insertion or correction. <br /> <br />PROVISION 2 <br />CITY <br /> <br />2.1 City's Right to Carry Out the Work <br /> <br />2.1.1 If the Contractor defaults or neglects to carry out the Work in accordance with the <br />Contract Documents, and fails within a seven (7) day period after receipt of a written <br />notice from the City to correct such default or neglect, the City may, without prejudice to <br />other remedies the City may have, correct such default or neglect. In such case, an <br />appropriate Change Order shall be issued deducting from payments then or thereafter <br />due the Contractor the cost of correcting such deficiencies, including compensation for <br />the AlE's additional services and expenses made necessary by such default or neglect. <br />If payments then or thereafter due the Contractor are not sufficient to cover such <br />amounts, the Contractor shall pay the difference to City. <br /> <br />2.1.2 In the event the Contractor has not satisfactorily completed all items on the Punch List <br />within thirty (30) days of its receipt, or by the Final Completion Date, whichever is latest, <br />the City reserves the right to complete the Punch List without further notice to the <br />Contractor or its surety. In such case, City shall be entitled to deduct from payments then <br />or thereafter due the Contractor the cost of completing the Punch List items, including <br />compensation for the AlE's additional services. If payments then or thereafter due <br />Contractor are not sufficient to cover such amounts, the Contractor shall pay the <br />difference to City. <br /> <br />PROVISION 3 <br />CONTRACTOR <br /> <br />3.1 Contractor's Warranty <br />3.1.1 The Contractor warrants all equipment and materials furnished, and work performed, <br />under this Contract, against defective materials and workmanship for a period of 1 year <br />after final acceptance as provided in the Contract, unless a longer period is specified, <br />regardless of whether the same were furnished or performed by the Contractor or any <br />Subcontractors of any tier. Upon written notice from the City of any breach of warranty <br />during the applicable warranty period due to defective material or workmanship, the <br />affected part or parts thereof shall be repaired or replaced by the Contractor at no cost to <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.