My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1725
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2011 10:43:03 AM
Creation date
7/13/2011 9:35:38 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1725
Date (mm/dd/yyyy)
06/15/2011
Description
Bid 11-04-02/Agmt w/Castle USA Corp for Fabric Canopy at Heritage Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CITY OF SUNNY ISLES BEACH <br />AGREEMENT WITH CASTLE USA <br />CORPORATION FOR THE DESIGN AND <br />CONSTRUCTION OF THE FABRIC CANOPY <br />STRUCTURE AT HERITAGE PARK <br />CONTRACT NO.CIOII-050 <br /> <br />THIS AGREEMENT, entered into this 12 day of _ II 2011, by <br />and between the CITY OF SUNNY ISLES BEACH (hereinafter referred s to the "City") <br />and CASTLE USA CORP. a Florida corporation, authorized to do business in the State of <br />Florida (hereinafter referred to as the "Contractor"), whose federal tax identification number <br />is 3~"_~ tooT7-=<'7 . <br /> <br />RECIT ALS <br /> <br />WHEREAS, the City is in need of a contractor for the design and construction of <br />fabric canopy structure at Heritage Park ("Services"), as more particularly described in <br />Attachment "A", attached hereto and made a part hereof; and <br /> <br />WHEREAS, the Contractor is qualified, willing and able to provide the Services on <br />the terms and conditions set forth herein; and <br /> <br />WHEREAS, the City desires to enter into this Agreement with Contractor to provide <br />the Services in a total amount not to exceed One Hundred Eight Thousand Two Hundred <br />Thirty-Six Dollars ($108,236.00). <br /> <br />NOW THEREFORE, in consideration of the foregoing and' for the mutual <br />covenants, representations and warranties and other good and valuable consideration, the <br />receipt and adequacy of which is hereby acknowledged, the parties agree as follows: <br /> <br />1. RECITALS. The Recitals set forth above are hereby incorporated into this agreement <br />and made a part hereof for reference. <br /> <br />2. SERVICES. Contractor shall provide to the City the Services as more particularly <br />described in Attachment "A" attached hereto and made a part hereof. <br /> <br />3. TERM. Subject to the provisions relating to the termination of this Agreement as set <br />forth in Paragraph 10 hereunder, the term of this Agreement shall commence from the <br />execution date of this Agreement and the Services shall be completed no later than 100 (One <br />Hundred) days thereafter. <br /> <br />4. LIQUIDATED DAMAGES AND OTHER REMEDIES FOR DELAY. In the event <br />the Services are not completed within 100 (One Hundred) days from the execution date of <br />this Agreement, and in the absence of any extensions granted by City, then the Contractor <br />shall be required to pay a liquidated damage penalty of $700.00 (Seven Hundred Dollars) for <br />each calendar day beyond the 100 (One Hundred) days completion period, continuing to the <br />time at which the Services are complete. Such amount is the actual cash value agreed upon <br /> <br />C I 0 11-050 Castle USA Corp. Canopy for Heritage Park <br /> <br />Page I of 11 <br /> <br />'-.-! <br /> <br />p <br />...; <br />
The URL can be used to link to this page
Your browser does not support the video tag.