Laserfiche WebLink
7 Plans, specifications and shop drawings prepared in connection with RFP <br />No. 11- 05 -01. <br />The enumerated Contract Documents above are hereby incorporated herein by references <br />regardless of whether they are specifically attached to this Agreement. <br />Article 3: Interpretation and Intent <br />3.1 The Contract Documents are intended to permit the parties to complete the <br />Work and all obligations required by the Contract Documents within the Contract <br />Time(s) for the Contract Price. The Contract Documents are intended to be <br />complementary and interpreted in harmony so as to avoid conflict, with words and <br />phrases interpreted in a manner consistent with construction and design industry <br />standards. <br />3.2 Terms, words and phrases used in the Contract Documents, including this <br />Agreement, shall have the meanings given them in the Contract Documents. Whenever <br />such terms, words or phrase are not specifically defined in the Contract Documents, <br />they shall have the generally accepted meaning as they are used in the construction <br />industry; and if there is no such generally accepted meaning, they shall be interpreted <br />according to their common and customary usage. Heading are used herein solely for <br />convenience. <br />3.3 The Contract Documents form the entire agreement between City and Contractor <br />and by incorporation herein are as fully binding on the parties as if repeated herein. No <br />oral representation representative or other agreements have been made by the parties <br />except as specifically stated on the Contract Documents. <br />3.4 The specifications herein of any act, failure, refusal, omission, event, occurrence <br />or condition as constituting a material breach of this Agreement shall not imply that other <br />non - specified acts, failures, refusals, omissions, events, occurrences or conditions shall <br />be deemed not to constitute a material breach of this Agreement. <br />3.5 In the event of any conflict, discrepancy, or inconsistency among any of the <br />Contract Documents, the order of precedence shall be as follows: <br />A. Addenda/Change Orders/ Written Amendment to this Agreement; <br />B. This Agreement; <br />C. Supplementary Conditions; <br />D. General Terms and Conditions; <br />E. Contractor's Response to Request for Proposals ( "RFP ") No. 11- 05 -01; <br />and <br />F. Request for Proposals ( "RFP ") No. 11- 05 -01. <br />C1011 -055 NAMIN CONSTRUCTION CO. INC. Page 2 of 15 <br />