My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1727
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1727
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2015 2:21:32 PM
Creation date
7/13/2011 10:45:21 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1727
Date (mm/dd/yyyy)
06/15/2011
Description
Bid 11-05-01/Agmt w/Namin Construction: Bella Vista Bay Park Impr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
able to sureties as a defense in the jurisdiction of the suit <br />shall be applicable. <br />12.o Notice to the Surety, the Owner or the Contractor shall <br />be mailed or delivered to the address shown on the sig- <br />nature page. <br />12.oWhen this Bond has been furnished to comply with a <br />statutory or other legal requirement in the location where <br />the construction was to be performed, any provision in this <br />Bond conflicting with said statutory or legal requirement <br />shall be deemed deleted herefrom and provisions con- <br />forming to such statutory or other legal requirement shall <br />be deemed incorporated herein. The intent is that this <br />Bond shall be construed as a statutory bond and not as a <br />common law bond. <br />12 DEFINITIONS <br />12.4 Balance of the Contract Price: The total amount <br />payable by the Owner to the Contractor under the <br />Construction Contract after all proper adjustments <br />have been made, including allowance to the Con- <br />tractor of any amounts received or to be received by <br />the Owner in settlement of insurance or other claims <br />for damages to which the Contractor is entitled, <br />reduced by all valid and proper payments made to or on <br />behalf of the Contractor under the Construction Con- <br />tract. <br />12.2 Construction Contract: The agreement between <br />the Owner and the Contractor identified on the <br />signature page, including all Contract Documents <br />and changes thereto. <br />12.3 Contractor Default: Failure of the Contractor, <br />which has neither been remedied nor waived, to per- <br />form or otherwise to comply with the terms of the <br />Construction Contract. <br />12.4 Owner Default: Failure of the Owner, which has <br />neither been remedied nor waived, to pay the <br />Contractor as required by the Construction Contract <br />or to perform and complete or comply with the other <br />terms thereof. <br />MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: * ** SEE RIDER ATTACHED * ** <br />(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) <br />CONTRACTOR AS PRINCIPAL <br />Company: (Corporate Seal) <br />Namin Constructf Co.INa In . <br />l I' Signature: Name and Title: Behiad I ,Pre nt <br />Address: 1951 N.W. 141st Street, Bay #9 <br />Opa Locka, FL 33054 <br />SURETY <br />Company: (Corporate Seal) <br />SureTec Insurance ,c0pany <br />Signature: <br />10L <br />Name and T' 4e:Burton Harris, Attorney -In -Fact & <br />Address: Fla. Resident Agent No.: A111883 <br />AIA DOCUMENT A312 PERFORMANCE BOND AND PAYMENT BOND • • DECEMBER 1984 ED. • AIA ® A312 -1984 3 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 <br />THIRD PRINTING - MARCH 1987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.