My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1749
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2013 2:24:28 PM
Creation date
7/22/2011 3:25:33 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1749
Date (mm/dd/yyyy)
07/21/2011
Description
Approving a Ground Lease and Dev. Agreement w/4M Investors, LLC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CONTRACTOR'S expertise includes estimating the total costs associated with the fmal completion <br />of an entire design-build job. Such costs associated with the estimation and calculation, include, <br />but are not limited to, consideration of material, equipment and labor and the escalation of the costs <br />of each in association with the realistic estimated duration of the project, the time of year, the <br />weather patterns associated with the location of the project, the labor market for the design and <br />construction associated with the location of the project, the type of facility, and consideration of the <br />time associated with the design and permitting (including all associated delays that accompany a <br />review through a municipal building department) of a complete set of plans and specifications. In <br />reliance upon the above referenced representations, the CITY hired the CONTRACTOR to provide <br />professional design services and complete construction services. CONTRACTOR shall be liable for <br />any defective or negligent design, whether patent or latent, and/or any negligence, strict liability or <br />breach of other legal duty to the extent and in the manner as hereafter set forth. <br /> <br />6.6 <br /> <br />Shop Drawings and Samples. <br /> <br />6.6.1 CONTRACTOR shall prepare and submit any submittals or shop drawings required <br />for permitting to the authority having jurisdiction, and shall furnish a copy to the City Manager. <br /> <br />6.6.2 CONTRACTOR shall prepare and maintain shop drawings and submittals <br />referenced in Paragraph 6.6.1 and make them available for review by CITY. <br /> <br />6.6.3 Review of the shop drawings by CITY shall be general and shall not be deemed an <br />acceptance of the shop drawings and shall not relieve the CONTRACTOR of the responsibility for <br />the accuracy of such drawings, nor for the proper fitting and construction of the work, nor for the <br />furnishing of material or work required by the Agreement and not indicated on the drawings. <br /> <br />6.7 <br /> <br />Supervision and Superintendence. <br /> <br />CONTRACTOR shall supervise and direct the Work competently and efficiently, <br />devoting such attention thereto and applying CONTRACTOR'S best skill, attention and expertise. <br />CONTRACTOR shall be solely responsible for and have control over the means, methods, <br />techniques, sequences and procedures of construction. CONTRACTOR shall be responsible to see <br />that the fInished Work complies with the Contract Documents. <br /> <br />6.8 <br /> <br />Proiect Management. <br /> <br />6.8.1 During the progress of on-site construction, CONTRACTOR shall provide full time <br />(defmed to be 8:00 a.m. through 5:00 p.m. Monday through Friday, legal holidays excluded) <br />competent project supervision and any necessary assistants who shall not be replaced without <br />written notice to CITY. The superintendent will be CONTRACTOR'S representative at the site. <br /> <br />6.8.2 The day to day management of the Project's subcontractors and vendors contracts, <br />schedules and requests for payment shall be by a competent project manager to whom the <br />superintendent shall report. The project manager will conduct regularly scheduled project meetings <br />for the purpose of project coordination and communication. The project manager shall be included <br />in the cost of the Work. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.