<br />c <br /> <br />Cross Construction Services, Inc. <br />@ 2011 DEMOLITION SAFETY PLAN <br />CROSS CONSTRUCTION SERVICES, INC. <br /> <br />6. The engineering survey provides Cross Construction Services, Inc. with the opportunity to <br />evaluate the job in its entirety. <br />7. Cross Construction Services, Inc. will plan for the wrecking of the structure, the equipment <br />to do the work, manpower requirements, and the protection of the public. The safety of <br />all workers on the job site will be a prime consideration. <br /> <br />8. During the preparation of the engineering survey, Cross Construction Services, Inc. will plan <br />for potential hazards such as fires, cave-ins, and injuries. <br /> <br />9. If the structure to be demolished has been damaged by fire, flood, explosion, or some other <br />cause, appropriate measures, including bracing and shoring of walls and floors, will be <br />taken to protect workers and any adjacent structures. <br /> <br />10. It will also be determined if any type of hazardous chemicals, gases, explosives, flammable <br />material, or similar dangerous substances have been used or stored on the site. <br /> <br />11. If the nature of a substance cannot be easily determined, samples will be taken and <br />analyzed by a qualified person prior to demolition. <br /> <br />c: 4. UTILITY DEMOLITION LoeA TIONS <br /> <br />1. One of the most important elements of the pre-job planning is the location of all utility <br />services. <br /> <br />2. All electric, gas, water, steam, sewer, and other services lines will be shut off, capped, or <br />otherwise controlled, at or outside the building before demolition work is started. <br /> <br />3. In each case, any utility company that is involved will be notified in advance, and its <br />approval or services, if necessary, will be obtained. <br /> <br />4. If it is necessary to maintain any power, water, or other utilities during demolition, such lines <br />will be temporarily relocated as necessary and/or protected. <br /> <br />5. The location of all overhead power sources will also be determined, as they can prove <br />especially hazardous during any machine demolition. <br /> <br />6. All workers will be informed of the location of any existing or relocated utility service. <br /> <br />c <br /> <br />7. The telephone numbers of the local police, ambulance, and fire departments will be <br />available at each job site. This information can prove useful to the job supervisor in the <br />event of any traffic problems, such as the movement of equipment to or from the job <br />site. <br /> <br />4 <br />