My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cross Construction Services, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-07-03 Demolition Services for Multiple City Properties
>
Responses
>
Cross Construction Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2011 2:28:27 PM
Creation date
8/17/2011 2:27:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Demolition Services
Bid No. (xx-xx-xx)
11-07-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C~ <br /> <br />Cross Construction Services, Inc. <br />@ 2011 DEMOLITION SAFETY PLAN <br />CROSS CONSTRUCTION SERVICES, INC. <br /> <br />6. Stringers of ample strength will be installed to support the flooring planks, and the ends of <br />such stringers will be supported by floor beams or girders, and not by floor arches <br />alone. <br /> <br />7. Planks will be laid together over solid bearings with the ends overlapping at least 1 foot. <br /> <br />8. When floor arches are being removed, employees will not be allowed in the area directly <br />underneath, and such an area will be barricaded to prevent access to it. <br /> <br />9. Demolition of floor arches will not be started until they, and the surrounding floor area for a <br />distance of 20 feet, have been cleared of debris and any other unnecessary materials. <br /> <br />10. Mechanical equipment will not be used on floors or working surfaces unless such floors or <br />surfaces are of sufficient strength to support the imposed load. <br /> <br />11. Floor openings will have curbs or stop-logs to prevent equipment from running over the <br />edge. <br /> <br />11. STORAGE OF WASTE MATERIAL <br /> <br />1. The storage of waste material and debris on any floor will not exceed the allowable floor <br />loads. <br /> <br />2. In buildings having wooden floor construction, the flooring boards will be removed from not <br />more than one floor above grade to provide storage space for debris, provided falling <br />material is not permitted to endanger the stability of the structure. <br /> <br />3. When wood floor beams serve to brace interior walls or freestanding exterior walls, such <br />beams will be left in place until other equivalent support can be installed to replace <br />them. <br /> <br />4. Floor arches, to an elevation of not more than 25 feet above grade, will be removed to <br />provide storage area for debris: Provided that such removal does not endanger the <br />stability of the structure. <br /> <br />5. Storage space into which material is dumped will be blocked off, except for openings <br />necessary for the removal of material. Such openings will be kept closed at all times <br />when material is not being removed. <br /> <br />c <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.