My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cross Construction Services, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-07-03 Demolition Services for Multiple City Properties
>
Responses
>
Cross Construction Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2011 2:28:27 PM
Creation date
8/17/2011 2:27:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Demolition Services
Bid No. (xx-xx-xx)
11-07-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c <br /> <br />Cross Construction Services, Inc. <br />@ 2011 DEMOLITION SAFETY PLAN <br />CROSS CONSTRUCTION SERVICES, INC. <br /> <br />5. The interior brickwork in some sections of industrial chimney shafts can be extremely weak. <br />If the stack has been banded with steel straps, these bands will be removed only as the <br />work progresses from the top down. <br /> <br />6. Sectioning of the chimney by water, etc. will be considered. <br /> <br />Safe work practices: <br /> <br />1. When hand demolition is required, it will be carried out from a working platform. <br /> <br />2. Experienced personnel will install a self-supporting tubular scaffold, suspended platform, or <br />knee-braced scaffolding around the chimney. <br /> <br />3. Particular attention will be paid to the design, support, and tie-in (braces) of the scaffold. <br /> <br />4. A competent person will be present at all times during the erection of the scaffold. <br /> <br />5. It is essential that there be adequate working clearance between the chimney and the work <br />platform. <br /> <br />6. Access to the top of the scaffold will be provided by means of portable walkways. <br /> <br />7. The platforms will be decked solid and the area from the work platform to wall bridged with a <br />minimum of two-inch thick lumber. <br /> <br />8. A top rail 42 inches above the platform, with a mid-rail covered with canvas or mesh will be <br />installed around the perimeter of the platform to prevent injury to workers below. Debris <br />netting will be installed below the platform. <br /> <br />9. Excess canvas or plywood attachments can form a wind-sail that could collapse the <br />scaffold. <br /> <br />10. When working on the work platform, all personnel will wear hard hats, long-sleeve shirts, <br />and eye and face protection, such as goggles and face shields, respirators, and safety belts, <br />as required. <br /> <br />11. Care will be taken to assign the proper number of workers to the task, <br /> <br />12. Too many people on a small work platform can lead to accidents. <br /> <br />c: <br /> <br />13. An alternative to the erection of a self-supporting tubular steel scaffold to "climb" the <br />structure will be a creeping bracket scaffold. <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.