My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c <br /> <br />c <br /> <br />/' <br /> <br />'--" <br /> <br />City of Sunny Isles Beach: Special Inspection Services <br />RFO No. 11-07-11 <br /> <br />. Oversight of project substantial completion <br />. Oversight of project final completion, punchlisting and close out <br /> <br />URS recognizes that the nature of the projects are such that only part-time services on-site may be all that is <br />required of URS during the construction phase of the project. Inspections will be performed on a pre- <br />scheduled periodic basis and at critical hold points prior to concrete pours and/or other construction activities <br />which may render inspection of a particular component impossible to perform. Our PM will call upon <br />specialized engineering technical support members at any given time during the final design, construction bid <br />phase or oversight process to overview the analysis and technical recommendations provided by other <br />project design consultants. <br /> <br />URS is also known as a top tier provider of full services engineering, project management and construction <br />administration services for the South Florida Water Management District and we are currently providing <br />engineering design and construction management/engineering during construction services on several active <br />projects related to everglades restoration work in South Florida. <br /> <br />Successful construction projects don't just happen; they require a positive, forward thinking <br />proactive management team and a partnering mentality with all project participants. URS has the maturity <br />of staff and experience to establish a cooperative teamwork approach to any project. Formally or informally, <br />we will create a partnering atmosphere, encourage open discussion settlement of contract issues at the <br />lowest possible level, and seek the least cost on all monetary issues. <br /> <br />URS' construction services approach will be to take a proactive role in any assigned project. While <br />serving as the City's consultant during this project, the ultimate goal of our services will be to verify that the <br />project is constructed in conformity with the plans, specifications and contract provisions - on time <br />and - on budget. <br /> <br />The following list of CM Projects presented in this RFP are a compendium of selected examples of the bridge <br />and facilities construction projects - some with significant environmental permitting challenges - which <br />demonstrate the broad range of construction services URS is capable of providing to the City in <br />support of this RFP. <br /> <br />2-5 I ~3 g E <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.