My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />Natalie D. DuQuesnay (Cont'd) <br /> <br />c <br /> <br />Project Manager 08/03 - 09/04 <br />Project Manger providing Design and Construction Management Services <br />to \Vashington Mutual Bank Construction Division. As a Project Manger <br />her responsibilities included construction management of concurrent <br />projects (as many as 20) and coordination of general contractor, <br />subcontractors and ,"endor services. She further provided support to the <br />\Vashington Mutual Real Estate Group in Building and Land Acquisition <br />and Feasibility Studies. <br /> <br />~ <br />~ <br /> <br />City of Miami Beach, Capital Improvement Program, Miami Beach, FL <br />Project Manager 11/01 - 08/03 <br />Project Manager providing Planning, Design and Construction <br />Management Services to the City of Miami Beach as part of the Parks and <br />Facilities Program Management contract awarded to URS CCHvoration. <br />f\S a Project Manager her responsibilities include; administering the City's <br />contracts with various Design Professionals and Contractors while <br />coordinating all design and construction efforts. She further provides <br />support in areas such as plan reviews, contract scoping, document <br />controls, payment submittals, change orders and construction claims. Her <br />projects have included construction management and administration for <br />the Bayshore Golf Course ($6 million), administration of the design and <br />construction management for the Bayshore Clubhouse ($5 million). She <br />has also managed design contracts for clubhouses and developed desif,'11er <br />solicitation documents for other projects. <br /> <br />Fort Lauderdale-Hollywood International Airport, Ft. Lauderdale, FL <br />Assistant Project Manager 05/98 - 11/01 <br />Assistant Project Manager for the Renovation/Expansion of the existing <br />terminal buildings ($30 million). Primarily responsible for coordination <br />and construction management of interior renovation of (3)-terminal <br />buildings each (2)-story in height. Coordinated procurement of <br />contracting methods, development and implementation of project <br />phasing, bidding/contracting and construction phase of the projects with <br />the design consultants and general contractors. Responsible for <br />coordination with the airlines, tenants and Broward County Aviation <br />department officials. Developed and managed a team to design, <br />coordinate and implement special systems and a communications <br />infrastructure to allow data and communications interfacing between all <br />three terminals and the Administration Building. <br /> <br />c <br /> <br />Allied Signal Inc., Morristown, New Jersey <br />Process Engineer 01/96 - 04/98 <br />Served as Process Engineer and was in charge of the process modeling of <br />batch and continuous distillation columns, reactors, and heat exchangers <br />using ASPEN and CHEMCAD simulation software. }t!so oversaw the <br />development of process flow diagrams and process and instrumentation <br />diagrams, equipment lists, material and balances for forward engineering <br />projects. Other projects included the development of Level 1 and 2 cost <br />estimates for a thermal oxidation unit and aqueous wastewater treatment <br />unit of a fluorocarbon plant using the existing design as a basis, including <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.