My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />Thomas F. Mullin, PE (cont'd.) <br /> <br />~ <br />\.... <br /> <br />42 & 31 story Latitudes on the River Towers* <br />42 & 27 story Ocean II Towers <br />40 & 35 story ICON Towers* <br />38,28 & 18 story Hidden Bay Towers <br />38 story Millenium Tower <br />37 story Ocean III Tower <br />37,27 & 17 story Murano @ Porto fino Towers* <br />36 story Sonesta Beach Hotel <br />35 story Blue condominium Tower* <br />34 story Ocean Grande Tower <br />34 & 22 story Murano Grande Towers* <br />30-story L'Hermitage Tower <br />29 story Jackson Tower <br />Recent Downtown l\1iami area High Rise Towers <br /> <br />Numerous other high rise towers and commercial buildings of smaller <br />heights <br /> <br />Miscellaneous Specialized Projects <br /> <br />c <br /> <br />Maglev High Speed Rail Project Manager for preliminary foundation <br />design studies/cost estimate for the proposed 13 mile long, 300 mph <br />Magnetically Elevated High Speed Train, Orlando, Florida. <br /> <br />Principal Engineer for Geotechnical studies and Finite Element <br />Settlement Modeling of large 300' High Cells 4 and 5, South Dade <br />Landfill, Dade County, Florida. <br /> <br />Principal Geotechnical Consultant for the Jackson Memorial Hospital <br />Expansion. Underpinning of a 4-story building combined with Tangent <br />Augercast Pile walls provided excavation support for the existing hospital <br />structure, Miami, FL. <br /> <br />Principal Investigator and Designer for the 1,200 LF Sand Transfer <br />Directionally Drilled Pipeline, Lake Work Inlet, FL. <br /> <br />Principal Geotechnical Consultant for the Town of Palm Beach Water <br />Mains Upgrade project. Project included 18 miles of water main <br />improvement including two (2) directionally drilled pipelines across the <br />Intracoastal Waterway, at 2,200 LF and 2,900 LF in length. <br /> <br />Principal Geotechnical Consultant for the geotechnical evaluation of the <br />Implosion Demolition of the 12-story Lake Tower One High Rise <br />Tower, Ocean Club Development, Key Biscayne, FL. <br /> <br />,.- <br />~ <br /> <br />Principal Geotechnical Consultant for the Kravis Center CEA <br />Expansion project, excavation design support. Project includes 7, 10 <br />and 20 foot high augercast pile retaining walls for lateral excavation <br />support adjacent to the Kravis Center. <br />
The URL can be used to link to this page
Your browser does not support the video tag.