|
<br />r'
<br />~
<br />
<br />c
<br />
<br />,-
<br />~
<br />
<br />Areas of Expertise
<br />
<br />( 1\ 11 InglJll'l'nJl;.'- I "llld
<br />I )l'\ (I, 'j1Il11'1l1 I k";lgll ,lI1d
<br />1\'rtl1lllllll!
<br />
<br />Years of Experience
<br />
<br />\\ JIll I ]\~: :, 'I l"lr'
<br />
<br />\\ llll (lillLT 11rl11< I": 'I ('II"'.
<br />
<br />Education
<br />
<br />l~~( I ":111111 I ]"rtd,1 ~I.JIl
<br />
<br />I III \ l'r, 11 \
<br />
<br />I ,1Ihll;1"l'l. I I,
<br />
<br />Registration / Certification
<br />
<br />":11111 1'1'
<br />
<br />":1111:' 1'1
<br />
<br />11"nd" (,I 'h
<br />\IIClll!!.'11l :,,,:(,,-
<br />
<br />URS
<br />
<br />Brett N. Oldford, PE
<br />Senior Civil Engineer/Project Manager
<br />
<br />Overview
<br />
<br />Brett Oldford has over seventeen years of survey, drafting, planning,
<br />design, permitting, value engineering, and construction inspection
<br />experience covering infrastructure, civil site design and land development
<br />projects. lvir. Oldford's experience includes providing professional
<br />consulting services for both private and municipal sector clients. Serving
<br />as Project Manager, lv1r. Oldford's project list includes large scale
<br />residential, commercial and mixed-use developments, marinas, dredge and
<br />fill projects, water resource, stormwater management system and utility
<br />improvements, roadway projccts, municipal parks and infrastructure
<br />design.
<br />
<br />Project Specific Experience
<br />
<br />Ocean Grande Pedestrian Underpass, Ponte Vedra, FL
<br />Lcad Enginecr for a 100 foot concrcte underpass travcrsing A-1-A that
<br />served as the main pcdestrian access point to the Atlantic Ocean from the
<br />Occan Grandc development.
<br />
<br />Marriott Ocean Pointe Phase 5, Palm Beach Shores, FL
<br />Project Managcr/Lead Engineer for a multi-phased high-rise
<br />condominium developmcnt on the shores of the Atlantic Ocean.
<br />
<br />Lake Boynton Estates Utility Improvements, Boynton Beach, FL
<br />Projcct Manager watermain, sanitary scwer and drainage improvements
<br />along 3 miles of roadway in a 200 unit, 80 acre subdivision. Contraints
<br />during design included maintaining continuous utility service the
<br />homeowners during construction. The utility improvements included
<br />planning, design, permitting, bid assistance and construction phase
<br />serviccs for the City of Boynton Beach Utility Department.
<br />
<br />River Club Park of Commerce, Bradenton, FL
<br />Project Manager for a 500 unit residential and 125,000 sf professional
<br />office mixed use development located on 165 acres in Manatee County,
<br />FL. The project involved design and permitting through state regulatory
<br />agencies including FDOT, FDEP, SWF\'(1NID and Manatee County.
<br />
<br />Emerald Field, Hudson, FL
<br />Project Manager for the planning, design, permitting and construction of
<br />a 324-unit residential development located on 60 acres in Pasco County.
<br />FL. Innovative design enabled a balanced earthwork design on a site
<br />located at the low end of a closed drainage basin. The site was designed
<br />and permitted within a 6 month permitted to meet client schedule
<br />constra1l1ts.
<br />
|