My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c <br /> <br />Areas of Expertise <br /> <br />F ounda tion I::nginecring <br />Pile Dc:;ign and Comtrunion <br />Dmamic Pile T es ting <br /> <br />Years of Experience <br /> <br />With l'RS: 11 Years <br />With Other Finn:;: 7 Year:; <br /> <br />Education <br /> <br />13SCF / 1983 / l'niHTsit\ of <br />J:!onda <br />i\lSCL / 1987 / l'nl\Tr:;it\ of <br />l;!c)rida <br /> <br />c <br /> <br />Reg istration / Certification <br /> <br />J 9S9 / Profc"iona! EnginC'cr / <br />J:lnricb # -1-1111.:; <br />100S / .\ch-anccd PD\ <br />Ccrttf1cltir,n / Foundation (~.\ <br />IJ:-;!)VJ r~:\al11inatjon <br /> <br />c <br /> <br />URS <br /> <br />Michael R. Sharp, PE <br />Senior Geotechnical Engineer <br /> <br />Overview <br /> <br />Mr. Sharp has over 28 years of experience in project management, <br />foundation design and testing, and preparation of construction <br />recommendations for roadways, major highway bridges and related <br />earthwork, buildings and storage tanks, wastewater treatment plants, <br />pipelines, and earthen dams. Typical projects are described below. <br /> <br />Project Specific Experience <br /> <br />Project Manager, Maitland Boulevard (SR 414) Extension (Project <br />414-211), Orlando-Orange County Expressway Authority, Orange <br />County, Florida: Directed dynamic pile testing program for the <br />extension of Maitland Boulevard a distance of about 1.6 miles to the west <br />from approximately the Orange/Seminole County line. The project <br />included single-span bridge structures over a CSX Railroad spur and US <br />441 as well as an elevated viaduct structure, approximately 2,800 feet long, <br />that spans Overland Road and a Florida Central Railroad mainline. The <br />single-span structures and portions of the viaduct were supported by I-IP <br />14 x 89 steel piles while foundations for the remainder of the viaduct <br />consisted of 24-inch square, prestressed concrete piles. Results of the <br />testing were evaluated to develop appropriate production pile lengths and <br />installation criteria throughout the project. <br /> <br />Project Manager, District Wide Geotechnical Services, FDOT <br />District Five, Florida: Directed dynamic pile testing programs on <br />several bridge widening/ replacement projects within the District including <br />SR 528 over the Indian River, SR 500 over Canal C-57, US 192 over Mill <br />Slough, SR 520 over Second and Jim Creeks, SR 25 over Lake Palatlakaha <br />Creek, CR 484 over CSX Railroad, and SR 11 over Little Haw Creek. <br />Results of the testing were evaluated to develop appropriate production <br />pile lengths and installation criteria at each st.ructure location. Pile types <br />included 18-inch, 24-inch, and 30-inch square prestressed concrete piles as <br />well as 20-inch diameter pipe piles. <br /> <br />Project Manager, District Wide Geotechnical Services, FDOT <br />District Seven, Florida: Provided foundation design as well as <br />construction engineering, pile load testing and inspection services, along <br />with drilled shaft inspection services on roadway and bridge projects <br />within the District. <br /> <br />Senior Geotechnical Engineer, New Berth 10, Port of Cristobal, <br />Colon, Republic of Panama: Provided oversight for Panama Ports <br />Company of Contractor's dynamic pile testing program implemented to <br />develop foundation installation criteria for piles supporting a new wharf at <br />the Port of Cristobal. Piles included 28-inch octagonal prestressed <br />concrete piles, with and without 26-inch diameter pipe pile extensions, as <br />well as 30-inch diameter, battered pipe piles. Scope of services included <br />oversight of testing program as well as review and evaluation of testing <br />data and pile installation criteria. <br />
The URL can be used to link to this page
Your browser does not support the video tag.