Laserfiche WebLink
<br />., <br /> <br />. <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />,.., <br />. <br /> <br />., <br />. <br /> <br />,., <br />. <br /> <br />.., <br />. <br /> <br />'"l <br />. <br /> <br />., <br /> <br />. <br /> <br />., <br />. <br /> <br />., <br />. <br /> <br />., <br /> <br />. <br /> <br />,.., <br />. <br /> <br />,., <br />. <br /> <br />.., <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />Resume <br /> <br />Hidalberto Gonzalez, CBI <br />Senior Bridge Inspector <br /> <br />contractors pay schedules. The project consisted of several steel and concrete bridges. Responsible for the inspection of a 3- <br />span continuous bridge over the Tamiami canal. The bridge consisted of a 3-span reinforced C-I-P on pile bents. <br />MDX Contact Person: Mr. Valentine Onuigbo, (305) 416-2588 - MDX Work Program No. 83605.030 <br /> <br />6/1999.1212001: SR112 Flyover at LeJeune Road Reconstruction Project <br />Responsible for all aspects of construction and engineering inspection. Duties included the supervision of all project <br />personnel, the scheduling of meetings such as but not limited to preconstruction, utility, pre-paving, pre-signalization, pre- <br />piling, etc... Duties included the construction supervision, and engineering inspection of major structural contractor operations. <br />Major items of work included drilled shaft installation, pier pours. Superstructure erection of steel plate girder bridges. In <br />addition was responsible for the monitoring of all sampling and testing on the project; and the issuing of materials certification <br />statements as required on the project. <br />Contact Person: AU A/-Said, P.E. (305) 470-5344 <br />6/1999.1211999: Daytonia Road Bridge Reconstruction Project <br />Responsible for all aspects of construction and engineering inspection. Duties included the supervision of all project <br />personnel, the scheduling of meetings such as but not limited to preconstruction, utility, pre-paving, pre-signalization, pre- <br />piling, etc... Duties included the construction supervision, and engineering inspection of major structural contractor <br />operations, in the capacity of Sr. Bridge Inspector. Major items of work included supervision of pile installation in Daytona <br />Road Bridge, superstructure erection of false work, placement of mild steel and main post tensioning steel, and placement of <br />concrete deck. The superstructure consisted of a continuous post-tensioned slab pile over the Daytona Road Bridge. <br />Contact Person: AU A/-Said, P.E. (305) 470-5344 <br /> <br />From: 1/1997 to 5/1999 Cleveland Road Bridge Reconstruction Project <br />Responsible for all aspects of construction and engineering inspection. Duties included the supervision of all project personnel, the <br />scheduling of meetings such as but not limited to preconstruction, utility, pre-paving, pre-signalization, pre-piling, etc... Duties included the <br />construction supervision, and engineering inspection of major structural contractor operations, in the capacity of Sr. Bridge Inspector. Major <br />items of work included supervision of pile installation in Indian Creek Bridge, superstructure erection of false work, placement of mild steel <br />and main post tensioning steel, and placement of concrete deck. The superstructure consisted of a continuous post-tensioned slab pile <br />over the Indian Creek bridge. The spans were in excess of 140ft. In addition was responsible for the monitoring of all sampling and <br />testing on the project; and the issuing of materials certification statements as required on the project. <br />Contact Person: AU A/-Said, P.E. (305) 499-2361 <br /> <br />From: 1995 to 1997 SR826 & Kendal! Drive (11 Bridges & Flyover) <br />Sr. Bridge Inspector _ Widening and reconstruction. Responsible for the administrative and technical aspects of the bridge portion of the <br />project from letting through the submittal of the final estimate. Responsible for the complete inspection of pile driving operations, concrete <br />pier column pours. Duties also included the field supervision of steel plate girder erections. The bridge consisted of a two lane ramp with <br />several continuous units of spans up to 180' on sharp curve. The spans consisted of steel plate girder with full depth solid diaphragms on <br />curve portions. Contact Person: Dari Vorce, (305) 499-2390 <br /> <br />From: 1992 to 1994 SR.90 (US-41) (Tamiami Trail) <br />Senior Bridge Inspector _ This project included the construction and engineering inspection of a $9 million contract for the Florida <br />Department of Transportation. Some of the elements present in this contract were new construction, re-surfacing and widening 5 miles of <br />roadway including two grade separation structures along SR-90 (US-41) (Tamiami Trail) in Dade County, Florida. Inspector of Structures <br />and Bridge Construction for continuous flat slab bridge over Tamiami Canal. Bridge construction widening of SW 97th Avenue, over <br />Tamiami Canal and total bridge reconstruction of SW 8th Street over 94th Avenue canal. Responsibilities included the inspection of Pre- <br />cast piles, pile driving, reinforcing steel layout and the concrete testing of the sub-structure and super structure, bridge and roadway <br />drainage, highway lighting, fencing, guardrail, maintenance of traffic and roadway inspection, monitoring embankment progress the <br />compaction and density on the highway. Supervision of the contractor and all the sub-contractor bridge and roadway construction <br />operations, as well as maintaining project records and approvals of contractor and sub-contractors pay schedules. <br />Contact Person: Sam A/-Said, P.E., (305) 499-2470 <br /> <br />From: 1991 to 1992 NW 58th Street to NW 95th Street and from NW 54th Street to NW 62nd Street. Sr. Bridge Inspector - Provided <br />construction and engineering inspection on a $21 million project for the Florida Department of Transportation involving new construction, <br /> <br />- ~ <br />---- - <br /> <br />..... -- ~ <br /> <br />Page 2 of 3 <br />