Laserfiche WebLink
<br />., <br />. <br /> <br />., <br /> <br />51 <br /> <br />GBF Engineering, Inc. <br />C IV I LEN GIN EER IN G AND CON S T Rue T ION MAN A G EM EN T <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />..., <br />. <br /> <br />To Whom It May Concern: <br /> <br />Subject: Reference Letter for Tally Engineering, Inc. <br /> <br />., <br /> <br />. <br /> <br />-, <br />. <br /> <br />Financial Project ID: <br />F.A.P. Number: <br />Contract No.: <br />Design Build Contractor: <br />CEI Firm: <br />Total Amount: <br /> <br />414561-1-52-0 I / 414561-2-52-0 I <br />07541541 and 07541571 <br />E4K87 <br />Community Asphalt Corporation <br />GBF Engineering, Inc. <br />$12,148,545.03 <br /> <br />..., <br />. <br /> <br />., <br />. <br /> <br />Type of Construction services: Construction administration, inspection and materials testing services. <br /> <br />.., <br /> <br />Scope of this project: Modification and reconstruction of four ramps at Miramar parkway and 1-75 <br />interchange. Modification to the bridge at Miramar Parkway. Installation of sound walls, including <br />auger piling for sound walls. Bridge construction at Snake Creek and 1-75. Adding two lanes to 1-75 <br />northbound and one lane to 1-75 southbound. Milling and resurfacing of 1-75 north and east bound <br />from the Homestead extension to Miramar Parkway. <br /> <br />.., <br />. <br /> <br />. <br /> <br />.., <br /> <br />GBF Engineering, in association with Tally Engineering, was selected by FOOT to perform contract <br />administration and inspection services of the scope provided. In this project Tally Engineering <br />provided GBF Engineering full time project administration whose prime responsibility is to manage <br />day to day operations of the project. Tally is responsible for the following: all bridge and roadway <br />inspection services; responses to all RFIs; monitoring the shop drawings for coordinate between design <br />and construction; ensure that all the proper drawings have been released for construction; review <br />contractors monthly estimates and approve payment to the contractor on behalf of FOOT; and project <br />close out and all the certification that is required for final estimate of this project. <br /> <br />., <br />. <br /> <br />. <br /> <br />.., <br /> <br />.., <br /> <br />Evaluation Criteria Yes No <br />Were Inspection performed timely? ../ <br />Was the Quality of work satisfactory? ,/ <br />Was Tally Engineering, Inc. Responsive to the Owner and Contractor? ,i <br />Was Tally Engineering, Inc. timely with reviews and submittals? " <br />Did Tally Engineering, Inc. quickly resolve issues as they arose? .J <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />. <br /> <br />., <br /> <br />Sincerely, <br /> <br />. <br /> <br />., <br /> <br />,A~~ ~-/r7~ <br /> <br />AsIan Dilmaghani, P.E. <br />Senior Project Engineer <br />GBF Engineering, Inc. <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />(954) 492-9921 Office <br />(954) 492-9909 Fax <br /> <br />..., <br />. <br /> <br />GBF Engineering, Inc <br />5340 NW 10th Terrace Fort Lauderdale, Florida 33309 <br />