Laserfiche WebLink
<br />., <br /> <br />. <br /> <br />~ <br />-'~ <br />~ <br />~ <br />~, . <br />-....\ f <br />-=;:" ''L./ <br /> <br /> <br />., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />RICK SCOTT <br />GOVERNOR <br /> <br />Florida Department of Transportation <br />605 Suwannee Street <br />Tallahassee, FL 32399-0450 <br /> <br />May 10, 2011 <br /> <br />ANANTH PRASAD, P.E. <br />SECRETARY <br /> <br />.., <br />. <br /> <br />-, <br /> <br />Pirooz Borojerdi, PE <br />President <br />TALLY ENGINEERING, INC. <br />1806 N Flamingo Road, Suite 300 <br />Pembroke Pines, Florida 33028 <br /> <br />. <br /> <br />-, <br /> <br />. <br /> <br />Dear Mr. Borojerdi: <br /> <br />..., <br /> <br />The Florida Department of Transportation has reviewed your application for qualification package and determined that the <br />data submitted is adequate to qualify your firm for the following types of work: <br /> <br />. <br /> <br />Group 3- Highway Design - Roadway <br /> <br />.., <br />. <br /> <br />3.1 <br />3.2 <br /> <br />- Minor Highway Design <br />- Major Highway Design <br /> <br />Group 4 - Highway Design - Bridges <br /> <br />.., <br /> <br />. <br /> <br />4.1.1 - Miscellaneous Structures <br /> <br />., <br /> <br />Group 9 - Soil Exploration, Material Testing and Foundations <br /> <br />-, <br /> <br />9.1 <br />9.2 <br />9.3 <br />9.4.1 <br /> <br />- Soil Exploration <br />- Geotechnical Classification Laboratory Testing <br />- Highway Materials Testing <br />- Standard Foundation Studies <br /> <br />. <br /> <br />. <br /> <br />Group 10 <br /> <br />- Construction Engineering Inspection <br /> <br />-, <br /> <br />10.1 <br />10.3 <br /> <br />- Roadway Construction Engineering Inspection <br />- Construction Materials Inspection <br /> <br />. <br /> <br />.., <br /> <br />Your Unlimited Notice of Qualification shall be valid until June 30, 2011 at such time as your December 31.2010 overhead <br />audit will be due to comply with the Department's requirement on overhead audits. We will automatically notify your firm 45 to 60 days <br />prior to your update deadline. <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />On the basis of data submitted the Department has approved your accounting system and considers the rates listed below as <br />acceptable rates for qualification purposes. <br /> <br />-, Overhead Rate <br /> <br />Home/Branch <br />Office <br />74.60% <br /> <br />Field <br />Office <br />144.07% <br /> <br />Overtime <br />Premium <br />Reimbursed <br /> <br />Direct Expense <br />6.36% (Home) <br />9.80% (Field)* <br /> <br />. <br /> <br />'Rent and utilities excluded from field office rate. These costs will be directly reimbursed on contracts that require the consultant to <br />.., provide field office. <br /> <br />. <br /> <br />Should you have any questions, please feel free to contact me at 850/414-4485. <br /> <br />..., <br /> <br />. <br /> <br />~o;m.LJRQ C . crl(Y0\ <br /> <br />Lorraine E. Odom <br />Professional Services <br />Qualification Administrator <br /> <br />www.dot.state.f1.11S <br /> <br />..., <br /> <br />· LEO/cmr <br /> <br />..., <br /> <br />. <br />