|
<br />,
<br />.
<br />
<br />Frances Grant
<br />
<br />Senior Technician
<br />
<br />Experience Highlights
<br />
<br />...,
<br />.
<br />
<br />Frances (Fran) Grant 35 years experience senior inspector/manager with a background in quality
<br />control of roadway, bridge and building construction as well as material testing and inspection.
<br />
<br />...,
<br />
<br />.
<br />
<br />KEY PROJECTS:
<br />Public Works
<br />CMTS
<br />Aug. 2005-2009 _ Representative Resident Engineer assigned to Water Works 2011 project.
<br />Construction Manager: Doug Van Note 954 522 2604
<br />Field representation of Engineer in installing of new infrastructure for the residential
<br />neighborhoods for the City of Fort Lauderdale. Sewer System and Water Mains installed
<br />underground and restoration of areas disturbed during construction.
<br />Highway
<br />Dec. 2001 _ Nov. 2002 -lnterstate-95 (1-95) Noise Walls, Miami, Florida (PB):
<br />Ali AI-Said, P.E. Construction Project Manager, 305-499-2361
<br />Senior inspector for August Cast wall on $40 million project along 1-95 from State Road (SR) 112
<br />to Miami-Dade/Broward County line. Project components include roadway widening, drainage
<br />improvement, lighting and signing and marketing.
<br />July 1993 _ Dec. 2001 _ Florida's Turnpike Construction Management Services (PB),
<br />Pompano Beach, Florida:
<br />Contact: Bill Sears, Project Manager, 954-975-4855
<br />As the Earthwork density engineer, Fran was responsible for the management of the Turnpike
<br />District's density independent assurance and assists the nuclear radiation safety programs for all
<br />Turnpike projects.
<br />Dec. 1992 _ June 1993 _ Veterans Expressway, Tampa, Florida (Senior Titled) (PB):
<br />Contact: Jim Moulton, Jr., PM, 941-647-5671
<br />Earthwork inspector assigned responsible for inspections for all project construction Items. This
<br />project consisted of one million square feet of borrow fill for new roadway construction in an
<br />environmentally sensitive area. Bridge spans and decks were built at various road crossings.
<br />Dec. 1991 _ Dec. 1992 - Military Trail Widening to Jog Road, Boynton Beach, Florida:
<br />Contact: Louie Williams, PM, 954-975-4855
<br />Roadway inspector responsible for scheduling, performing, and documenting materials testing
<br />and field inspection. The project included widening Military Trail and new construction/widening
<br />of associated bridges.
<br />June 1990 _ Dec. 1991 _ Florida's Turnpike Widening, Boca Raton to Boynton Beach, FL
<br />Contact: Bill Sears, Project Manager, 954-975-4855
<br />Roadway inspector responsible for inspection, quality control, and implementation of
<br />specifications for all materials and construction methods in the construction of shoulder widening
<br />and concrete barrier wall; roadway widening; and installation of 10 miles of barrier wall.
<br />Bridges
<br />Dec. 1996 _ Oct. 1997 - SR 20 Apalachicola River Bridge, Blountstown, Florida (PB):
<br />Contact: Billy Jackson, Project Manager, 904-638-0250
<br />Inspector for CEI services on this $35 million structure over the Apalachicola River in the Florida
<br />panhandle.
<br />Sept. 1995 _ May 1996 _ Keys Bridge Rehabilitation, Monroe County, Florida (PB):
<br />Contact: Kevin Baker, Project Manager, 305-470-5100
<br />Inspector during repair and rehabilitation of nine highway bridges in the Florida Keys. Repairs
<br />included replacement of dowel bars from the V-pier legs at two piers of Long Key Bridge with
<br />epoxy coated prestressed cables; replacement of various expansion joints on seven bridges; and
<br />neoprene pad metalizing and replacement on five bridges.
<br />
<br />.,
<br />.
<br />
<br />,.,
<br />.
<br />
<br />I
<br />
<br />...,
<br />.
<br />
<br />...,
<br />
<br />.
<br />
<br />,.,
<br />I
<br />
<br />...,
<br />.
<br />
<br />...,
<br />.
<br />
<br />-,
<br />.
<br />
<br />...,
<br />.
<br />
<br />...,
<br />
<br />.
<br />
<br />...,
<br />
<br />.
<br />
<br />...,
<br />
<br />.
<br />
<br />Career History :
<br />Tally Engineering, Inc. September 2009 to Present
<br />Water Works, City of Fort Lauderdale August 2005 to October 2009
<br />Parsons Brinckerhoff Water Division December 1992 to August 2005
<br />Water Conservation Group Client December 1989 to December 1992
<br />Reynolds, Smith and Hills September 1988 To December 1989
<br />Lockner Engineering September 1987 To September 1988,
<br />Metric Engineering October 1986 To September 1987
<br />Sterling Prestress, Inc. ,October 1984 To October 1986
<br />
<br />..,
<br />.
<br />
<br />...,
<br />
<br />.
<br />
<br />...,
<br />I
<br />
<br />More than 35 years of
<br />experience.
<br />Corporate Office:
<br />Pembroke Pines, Florida.
<br />Education:
<br />Civil Engineering Courses
<br />(Engineering Technician),
<br />Broward County Community
<br />College, Fort Lauderdale, Florida
<br />Professional Registrations
<br />Parsons CYA, Florida, 1984;
<br />TE, Florida, 1984
<br />
<br />Certifications:
<br />~~'-9~
<br />Concrete Field Technician
<br />Levell
<br />Drill shaft Inspection
<br />Pile Driving Inspection
<br />Asphalt Paving Inspector
<br />Levell and \I
<br />Final Estimates
<br />Levell and \I
<br />QC Manager
<br />
<br />~. ~~""'IfnJ._.
<br />~l w_...-"..._.tooo_
<br />
<br />Concrete Field Testing
<br />Technician
<br />
<br />J\ TROXLER'
<br />1'..1_ c..~..............I~,.,
<br />
<br />Nuclear Gauge Safety Training
<br />Certification
<br />
<br />(FOOT) and other
<br />Certifications Experience
<br />/Training:
<br />
<br />Precast/Prestressed Inspector
<br />Level I and II
<br />American Concrete Pipe
<br />Levell
<br />
<br />~
<br />I~
<br />
<br />Tally Engineering, Inc.
<br />
|