Laserfiche WebLink
<br />, <br />. <br /> <br />Frances Grant <br /> <br />Senior Technician <br /> <br />Experience Highlights <br /> <br />..., <br />. <br /> <br />Frances (Fran) Grant 35 years experience senior inspector/manager with a background in quality <br />control of roadway, bridge and building construction as well as material testing and inspection. <br /> <br />..., <br /> <br />. <br /> <br />KEY PROJECTS: <br />Public Works <br />CMTS <br />Aug. 2005-2009 _ Representative Resident Engineer assigned to Water Works 2011 project. <br />Construction Manager: Doug Van Note 954 522 2604 <br />Field representation of Engineer in installing of new infrastructure for the residential <br />neighborhoods for the City of Fort Lauderdale. Sewer System and Water Mains installed <br />underground and restoration of areas disturbed during construction. <br />Highway <br />Dec. 2001 _ Nov. 2002 -lnterstate-95 (1-95) Noise Walls, Miami, Florida (PB): <br />Ali AI-Said, P.E. Construction Project Manager, 305-499-2361 <br />Senior inspector for August Cast wall on $40 million project along 1-95 from State Road (SR) 112 <br />to Miami-Dade/Broward County line. Project components include roadway widening, drainage <br />improvement, lighting and signing and marketing. <br />July 1993 _ Dec. 2001 _ Florida's Turnpike Construction Management Services (PB), <br />Pompano Beach, Florida: <br />Contact: Bill Sears, Project Manager, 954-975-4855 <br />As the Earthwork density engineer, Fran was responsible for the management of the Turnpike <br />District's density independent assurance and assists the nuclear radiation safety programs for all <br />Turnpike projects. <br />Dec. 1992 _ June 1993 _ Veterans Expressway, Tampa, Florida (Senior Titled) (PB): <br />Contact: Jim Moulton, Jr., PM, 941-647-5671 <br />Earthwork inspector assigned responsible for inspections for all project construction Items. This <br />project consisted of one million square feet of borrow fill for new roadway construction in an <br />environmentally sensitive area. Bridge spans and decks were built at various road crossings. <br />Dec. 1991 _ Dec. 1992 - Military Trail Widening to Jog Road, Boynton Beach, Florida: <br />Contact: Louie Williams, PM, 954-975-4855 <br />Roadway inspector responsible for scheduling, performing, and documenting materials testing <br />and field inspection. The project included widening Military Trail and new construction/widening <br />of associated bridges. <br />June 1990 _ Dec. 1991 _ Florida's Turnpike Widening, Boca Raton to Boynton Beach, FL <br />Contact: Bill Sears, Project Manager, 954-975-4855 <br />Roadway inspector responsible for inspection, quality control, and implementation of <br />specifications for all materials and construction methods in the construction of shoulder widening <br />and concrete barrier wall; roadway widening; and installation of 10 miles of barrier wall. <br />Bridges <br />Dec. 1996 _ Oct. 1997 - SR 20 Apalachicola River Bridge, Blountstown, Florida (PB): <br />Contact: Billy Jackson, Project Manager, 904-638-0250 <br />Inspector for CEI services on this $35 million structure over the Apalachicola River in the Florida <br />panhandle. <br />Sept. 1995 _ May 1996 _ Keys Bridge Rehabilitation, Monroe County, Florida (PB): <br />Contact: Kevin Baker, Project Manager, 305-470-5100 <br />Inspector during repair and rehabilitation of nine highway bridges in the Florida Keys. Repairs <br />included replacement of dowel bars from the V-pier legs at two piers of Long Key Bridge with <br />epoxy coated prestressed cables; replacement of various expansion joints on seven bridges; and <br />neoprene pad metalizing and replacement on five bridges. <br /> <br />., <br />. <br /> <br />,., <br />. <br /> <br />I <br /> <br />..., <br />. <br /> <br />..., <br /> <br />. <br /> <br />,., <br />I <br /> <br />..., <br />. <br /> <br />..., <br />. <br /> <br />-, <br />. <br /> <br />..., <br />. <br /> <br />..., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />Career History : <br />Tally Engineering, Inc. September 2009 to Present <br />Water Works, City of Fort Lauderdale August 2005 to October 2009 <br />Parsons Brinckerhoff Water Division December 1992 to August 2005 <br />Water Conservation Group Client December 1989 to December 1992 <br />Reynolds, Smith and Hills September 1988 To December 1989 <br />Lockner Engineering September 1987 To September 1988, <br />Metric Engineering October 1986 To September 1987 <br />Sterling Prestress, Inc. ,October 1984 To October 1986 <br /> <br />.., <br />. <br /> <br />..., <br /> <br />. <br /> <br />..., <br />I <br /> <br />More than 35 years of <br />experience. <br />Corporate Office: <br />Pembroke Pines, Florida. <br />Education: <br />Civil Engineering Courses <br />(Engineering Technician), <br />Broward County Community <br />College, Fort Lauderdale, Florida <br />Professional Registrations <br />Parsons CYA, Florida, 1984; <br />TE, Florida, 1984 <br /> <br />Certifications: <br />~~'-9~ <br />Concrete Field Technician <br />Levell <br />Drill shaft Inspection <br />Pile Driving Inspection <br />Asphalt Paving Inspector <br />Levell and \I <br />Final Estimates <br />Levell and \I <br />QC Manager <br /> <br />~. ~~""'IfnJ._. <br />~l w_...-"..._.tooo_ <br /> <br />Concrete Field Testing <br />Technician <br /> <br />J\ TROXLER' <br />1'..1_ c..~..............I~,., <br /> <br />Nuclear Gauge Safety Training <br />Certification <br /> <br />(FOOT) and other <br />Certifications Experience <br />/Training: <br /> <br />Precast/Prestressed Inspector <br />Level I and II <br />American Concrete Pipe <br />Levell <br /> <br />~ <br />I~ <br /> <br />Tally Engineering, Inc. <br />