Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />Horacio Nelson Morales <br />Roadway Technician (Earthwork, Concrete and Asphalt Plant Inspector) <br /> <br />.., <br />. <br /> <br />Mr. Morales has over ten years providing asphalt inspection for various <br />Contractors as a Plant inspector and paving All or part of the duties performed <br />for the projects included, but were not limited to the following: <br /> <br />..., <br />. <br /> <br />., <br /> <br />Plant Technician <br />1. Perform various tests to ensure stockpiles and asphalt meet <br />specifications <br />2. Record test results and file paperwork accordingly <br />3. Make sure plant settings are in coordinates with the mix design formula <br />4. Calibrate lab equipment when needed <br />5. Receive basic training in creating new mix designs <br /> <br />. <br /> <br />..., <br />. <br /> <br />..., <br /> <br />Duties/Responsibilities: Observe Quality Control (QC) Technicians performing <br />tests and ensuring proper test procedures are followed. Generate random <br />numbers for taking QC samples for testing. Monitoring plant operations to ensure <br />individual stockpiles and cold bins are free of contamination from other aggregate <br />sources. Monitor asphalt truck temperatures and check truck beds for <br />cleanliness. Perform Verification testing (VT) of asphalt lots for comparison of test <br />results. Perform data entry of results into spreadsheets and the FDOT Laboratory <br />Information Management System (L1MS). <br /> <br />. <br /> <br />,., <br />. <br /> <br />.., <br /> <br />. <br /> <br />,., <br /> <br />1-75 & Pines Blvd <br />Project #: 415152-2-58-01 <br />Contractor: Bergeron Land Development <br />Ted Hojara (954) 680-6100 <br />Project Description: The project consisted of modifying the existing interstate <br />overpass entrance and exit ramps from a rural configuration to an urban <br />configuration as well as drainage, widening, and signalization along Pembroke <br />Pines Boulevard. Responsible: Quality control management of all material begins <br />use within the limit of the project. Monitor and inspected the field placement of all <br />structural fill material (embankment, pipe-backfill, sub-grade and base rock). <br />Monitor the placement of all structural concrete including drilled shaft, (for Mass <br />Arms and Cantilever Signs). Monitor the excavation and concrete placement for <br />all for Mass Arms and Cantilever Signs drilled shaft structural. Monitor the milling <br />and paving operation for all milling of existing asphalt pavement and new <br />Superpave Asphalt Concrete placement. <br /> <br />SW 4th Street at several locations on SW 4th street and SE 105th Place <br />Project #: 418949-1-52-01 <br />Miami-Dade County <br />Contractor: Williams Paving Company, Inc. <br />Raul Flores (305) 882-1950 <br />Project Description: Project consisted of milling and resurfacing miscellaneous <br />roadway improvement, sidewalk, driveways and drainage. <br />Responsibility: Monitor and inspected the field placement of all structural fill <br />material including sampling and material testing of embankment, pipe-backfill, <br />sub-grade and base rock. <br /> <br />. <br /> <br />" <br />I <br /> <br />..., <br />. <br /> <br />.., <br /> <br />. <br /> <br />,.., <br />. <br /> <br />..., <br />. <br /> <br />..., <br />. <br /> <br />" <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br />. <br /> <br />Experience Highlights <br /> <br />More than 10 years of <br />construction and materials <br />testing. <br /> <br />Corporate Office: <br />Pembroke Pines, Florida. <br /> <br />Certifications: <br />C~'-9 P <br />Asphalt Plant Technician <br />Levell and II <br />Earthwork Technician <br />Levell <br />Concrete Field Technician <br />Levell and II <br /> <br />,'!"f/!- ~<---N4oImtIl<II.' <br />'..:..ill .-...-........-- <br /> <br />Concrete Field Testing <br />Technician <br /> <br />J\ TROlLER <br />...._~ . (.....,..",. .....\i. ,...- <br /> <br />Nuclear Gauge Safety Training <br />Certification <br /> <br />.,-e <br /> <br />. I <br /> <br />Tallv Englf1eenng,I1c <br /> <br />.., <br />