My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tally Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Tally Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 2:27:13 PM
Creation date
8/30/2011 2:26:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svcs including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br />I <br /> <br />Fernando Torres <br /> <br />., <br />. Senior Technician (Earthwork, Concrete Inspector) <br /> <br />., KEY PROJECTS: <br /> <br />. <br /> <br />SR5/US1 Hurricane Wash-out Repairs from MM5.31 to MM 90.92 <br />Project #: 421240-1-52-01 <br />Contractor: Atlantic Civil, Inc. <br />Dan Pickel (305) 206-6904 <br />FDOT Contact: Charles Simpkis 954-677-7100 <br />Project Description: Project consisted of replacing shoulder in areas that was <br />damaged during Hurricane Wilma, added new should, riprap and asphalt. <br />Responsibility: Monitor and inspected the field placement of all structural fill <br />material including sampling and material testing of embankment within the slope <br />area. Monitor, sample and test the placement of all concrete including Riprap <br />slope improvement. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />..., <br />. <br /> <br />SR93 (1-75) & Sheridan Street Interchange <br />Project #: 411321-3-52-01 <br />Contractor: Weekley Asphalt Paving, Inc <br />Ronnie King (954) 680-8005 <br />FDOT Contact: Charles Simpkis 954-677-7100 <br />Project Description: The project consisted of widening and extending the existing <br />interstate overpasses entrance and exit ramps. Including reconfiguration and <br />modifying existing drainage, and signalization along, Sheridan Street. Add four <br />miles of guardrail along 1-75 between Miramar to Griffin exit. In milling and <br />resurfacing of Sheridan Street between, Dike Road to SW 142th avenue. <br />Responsibility: Monitor and inspected the field placement of all structural fill <br />material including sampling and material testing of embankment, pipe-backfill, <br />sub-grade and base rock. Monitor sample and test the placement of all structural <br />concrete including drilled shaft, (for Mass Arms and Cantilever Signs). Monitor <br />the excavation and concrete placement for all for Mass Arms and Cantilever <br />Signs drilled shaft structural. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />.., <br /> <br />. <br /> <br />Design & Construction of Ramp Westbound Eller Drive <br />To US1 and Widening Southbound US1 Bridge over 1-595 <br />Project #: 236806-3-52-01 <br />Contractor: PCL Constructors, Inc. <br />Danielle Murphy (954)923-6299 <br />FDOT Contact: Charles Simpkis 954-677-7100 <br />Project Description This project included the design and construction of a ramp <br />and bridge from westbound Eller Drive to US-1 southbound, in addition to the <br />widening of US-1 southbound bridge over 1-595. The project included roadway <br />improvements consisting for drainage, lighting, signing, striping, (MSE) retaining <br />wall system. Responsibility: Monitor and inspected the field placement of all <br />structural fill material including sampling and material testing of embankment, <br />pipe-backfill, sub-grade, MSE retaining wall system and base rock. Monitor <br />sample and test the placement of all structural concrete including drilled shaft, <br />(for Mass Arms and Cantilever Signs). Monitor the excavation and concrete <br />placement for all for Mass Arms and Cantilever Signs drilled shaft structural. <br /> <br />.., <br />. <br /> <br />" <br />. <br /> <br />..., <br />. <br /> <br />., <br />. <br /> <br />.., <br /> <br />. <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />Experience Highlights <br /> <br />More than 10 years of <br />construction and materials <br />testing. <br /> <br />Corporate Office: <br />Pembroke Pines, Florida. <br /> <br />Certifications: <br />~-r9r-- <br />Asphalt Paving Technician <br />Levell <br />Earthwork Construction <br />Inspection Level I and II <br /> <br />~l'. ..,.,....(.onot_~. <br />~: ....-"'"..---... <br /> <br />Concrete Field Testing <br />Technician <br /> <br />l~ TROXl~R' <br />,...~.._..c.-'.-""'<'-.. '-'....,Eo ,- <br />Nuclear Gauge Safety Training <br />Certification <br /> <br />-rt <br /> <br />r"'J <br />I . <br /> <br />Tally Englneenrlg, 11C <br />
The URL can be used to link to this page
Your browser does not support the video tag.