My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tally Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Tally Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 2:27:13 PM
Creation date
8/30/2011 2:26:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svcs including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br />I <br /> <br />, <br />. <br /> <br />- ........ <br /> <br />NEW--- - <br />.....- - ~ <br /> <br />MILLENNIUM <br />DESIGN CONSULTANTS. INC. <br /> <br />Resume <br /> <br />, <br />I <br /> <br />Esen Y. Tokay, P.E. <br /> <br />Senior Structural Engineer <br /> <br />-, <br />. <br /> <br />Professional Registration <br />Professional Engineer: FL # 32197 <br />Special Inspector, FL# 274 <br /> <br />Experience and Qualifications <br /> <br />Mr. Tokay serves as Senior Structural Engineer and Project Manager for New <br />Millennium. He has over 25 years of experience in the design of bridges, buildings <br />and other specialty structures. Mr. Tokay began his career in Chicago. He has <br />worked on both complex and major structures for bridges and buildings and has <br />specifically 15 years of experience in the analysis and design of bridge and <br />transportation structures including movable bridges. <br /> <br />., <br />. <br /> <br />Education <br />M.S. Civil Engineering, Northwestern <br />University, 1960 <br /> <br />-, <br />. <br /> <br />, <br />. <br /> <br />PROJECT EXPERIENCE: <br /> <br />2004-2009: Bicentennial Park Seawall _ Miami-Dade County, Florida. Project Manager for the replacement of the seawall with docking <br />facilities at Bicentennial Park and along the west and south edges of the slip adjacent to the park. Services include programming and <br />schematic design, design development, construction documents and post-construction administration. Involved in permitting from <br />regulatory agencies including State EPA, Corps of Engineers, DERM and City of Miami. Assisted the City of Miami in obtaining a grant for <br />the project from F.I.N.D. <br /> <br />.., <br />. <br /> <br />..., <br /> <br />2004-2006: Killian Parkway over SR-874 _ Miami-Dade County, Florida. Project consists of the design of a trumpet entrance ramp <br />from Killian Parkway to SR-974 in Miami Dade County. The bridge ramp consists of a two span continuous steel plate girder bridge with <br />142 ft spans. Assisted in the design verification of the steel plate girders. Reviewed and approved Shop Drawings. <br /> <br />. <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />2000-2002: Lyons Road Bridge _ Palm Beach County, Florida. Responsible for the design of several continuous flat slab bridges on <br />Lyons Road in Palm Beach. Duties included the generation of live loads the, longitudinal analysis, and the design of the concrete slab all <br />of which were done by hand. Assisted in substructure design including end bents and abutments. <br /> <br />..., <br /> <br />1999-2001: Miami International Airport Bridges - Miami-Dade County, Florida. Project Consists of the design of four major bridges <br />one Continuous Rolled Steel Girder Bridge with Integral Supports steel cap support and three C-I-P Post Tensioned bridges and. <br />Responsible for the complete design of the continuous steel beam bridge that was done utilizing AASHTO's Standard Specifications and <br />done by hand. Integral Steel Piers were utilized to resolve major complex geometric issues as a result of tight airport geometric <br />requirements. <br /> <br />. <br /> <br />., <br /> <br />1998-2000: SW 2nd Avenue Bridge _ Miami-Dade County, Florida. Assisted in the design of a 300 ft steel box girder bascule bridge <br />over the Miami River. Responsible for the complete design of counterweight system and the design of the trunnion girders. In addition <br />responsible for the design and development of special details for the trunnion hub assembly and bearings. <br /> <br />. <br /> <br />..., <br /> <br />1998: Temporary Passenger Connector - Miami International Airport, Miami-Dade County, Florida. Responsible for the structural <br />elements of the connector between concourse "D' and "E". Connector consisted of a structural steel frame supported on shallow footings <br />anchored to the existing concrete pavement. Developed construction phasing to allow for normal gate operations during construction. <br />Scope of work included design of foundations for aircraft loading bridges. (Completed 1997 MDAD $3 million) <br /> <br />., <br />. <br /> <br />. <br /> <br />. <br /> <br />1995-1997: Sunny Isle Bascule Bridge Renovations - Miami-Dade County, Florida. Renovations were made to a four-lane eastbound <br />bridge and a four-lane westbound bridge over the intercoastal waterway. The movable spans were double-leaf bascule spans supported by <br />concrete bascule piers. Involved in extensive structural and bascule machinery modifications, including the design of modified trunnion and <br />machinery bases. Developed bascule leaf jacking scheme to facilitate trunnion replacement. Designed new stairs, platforms and a <br />maintenance bridge. <br /> <br />-, <br /> <br />.., <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />., <br /> <br />4868 SW 72." Annuc. Miami, Florida 33155 -I'honc 305.6(,7.4772 - Fax 305.667.1790 - www.nmdccng.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.