Laserfiche WebLink
<br />.. <br />1 <br />~ <br />~ <br />~ <br />:) <br />'l <br />:t <br />~ <br />~ <br />:. <br />-. <br />:t <br />') <br />~ <br />~ <br />() <br />(t <br />() <br />:t <br />. <br />. <br />~ <br />:l <br />'t <br />. <br /> <br />[~.t-..' 'jl Calvin. Giordano & Associates. Inc. <br />~tEXCErTloNAL SOLllTIONS <br />i <br /> <br />SABRINA BAGLIERI <br /> <br />Director of Construction Services <br /> <br />SUMMARY OF QUALIFICATIONS <br />Ms. Baglieri has 22 years of experience as a civil engineer. She is an expert in the <br />selection, setup, management, and control of roadway, parks and buildings projects <br />from the bidding process to its culmination, including management of the hurricane <br />debris collection monitoring and data recording. Ms. Baglieri has extensive computer <br />knowledge on operative systems such as DOS, Windows and the following programs: <br />Cadd2000, Excel, Microsoft Word, Timberline, Construction Link (CLI), Primavera, <br />PowerPoint, and Quattro Pro for Windows. <br /> <br />Ms. Baglieri has extensive experience and knowledge directly applicable to all types of <br />projects, relying on her background in engineering, construction and project <br />administration. Furthermore, she is well versed in the municipal processes necessary to <br />get work tasks completed on time, as well as she has demonstrated experience working <br />within allocated budgets. These skills and aptitudes have all been exercised in her <br />capacity as Director of Capital Improvements for several local municipalities through <br />Calvin, Giordano & Associates' various continuing services municipal contracts. The <br />breadth of her work has spanned all realms of implementation projects - from small <br />residential-scale, community-scale, and urban scale. As such she has the necessary <br />knowledge in the management of the dynamics inherent in work scheduling, tasking, <br />sequence matrices necessary to maintain continuity of work and fulfillment of the <br />assessed milestones. These are important issues, especially when dealing with LAP <br />funding, grants monies, bond assessments, and in both responding to the expressed <br />needs of the community and to the management of complaints and issues in an <br />expedited manner <br /> <br />PROJECT EXPERIENCE <br />City of Weston, Florida Projects <br /> <br />~ <br />. <br />-... <br />. <br />. <br />.. <br />') <br />i') <br />~ <br />') <br />~ <br />() <br />o <br />r) <br />() <br />(l <br />o <br />~ <br />. <br /> <br />Vista Park: <br />Boulevard: new roadway construction <br />Vista Park Development: Construction of 4 soccer fields, 4 softball fields, 2 <br />concession buildings, a maintenance building, and parking area. Provided <br />lighting, lift station, water and sewer designs. <br />. Traffic Signals for Weston Road/South Commerce Parkway <br />. Tequesta Trace Concession Building Parking and Drainage <br />. Bonaventure Master Plan Phase I, Il, III and IV. Upgrade of all drainage, <br />landscape, and roadway elements. <br />. Saddle Club Rd @ South Post Road Roundabout <br />. Bonaventure Blvd. @ Blatt Road Roundabout <br />. New traffic signals for Weston Road/North Corporate Lakes <br />. FS 55 Emergency Signal <br />. Saddle Club/ Arvida/Bonaventure overlay of roads and road/drainage <br />improvements <br />. Bonaventure/Racquet Signal <br />. Regional Park/Parking Modification. Construction of Loop Road to connect <br />existing parking lots. <br /> <br />EDUCATION <br /> <br />B.A., Civil Engineering, <br />Universidad Rafael Urdaneta <br />Maracaibo, Venezuela <br /> <br />CERTIFICATIONS <br /> <br />Governor's Hurricane <br />Conference <br /> <br />Recovery Disaster - The <br />Local Government Role <br /> <br />Erosion Control Certified <br />Inspector <br /> <br />CTOP Final Estimates 1 <br /> <br />CTOP Earthwork <br />Construction Inspector 1 <br /> <br />CTOP Asphalt Paving <br />Technician Level 1 <br /> <br />OSHA Construction Safety <br />+ Health <br /> <br />Page 3113 <br />