Laserfiche WebLink
<br />. <br />1 <br />~ <br />. <br />. <br />. <br />:l <br />... <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /><l <br />. <br />. <br /> <br />" <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />() <br />() <br /><I <br />() <br />. <br />. <br /><l <br />() <br />(l <br />() <br />() <br />() <br />. <br /> <br />r~JI. Calvin. Giordano S Associates. Inc. <br />~IExcErT'oNAL SOlllllONS <br /> <br />I <br /> <br />Gary Craig, Page 2 <br /> <br />Bridge Surveyor, Caguana River Bridge, Utuado, Puerto Rico. Provided construction services to the <br />Puerto Rico Highway authority for a post-tensioned concrete segmental bridge constructed and <br />incrementally launched across the river 1,270 feet into final position. <br /> <br />CEI services related to segmental bridge pre-casting box girder bridge projects, assignments as survey <br />party chief, geometry control, senior bridge and roadway construction inspector positions in Florida (FDOT <br />projects up to 250 million dollars). Bridge maintenance contract District 3. <br /> <br />Senior Inspector, CR-220 on the Swimming Pen Creek Bridge Project. Bridge and roadway <br />reconstruction of 0.8 mile divided highway/bridge replacement/utility relocation project. Conducted <br />verification, inspection and testing. The work consisted of building a new six-lane bridge seven spans on <br />pile foundations, with concrete beams, cast-in-place pile caps, piers and bridge deck, pile driving, and <br />approach subgrade and base course and paving. Inspected installation of 18-inch DIP water main. <br />Supervised inspectors, maintained daily inspection reports, and verified earthwork and pay quantities. <br />Contact: Jeff Green (800) 207-8236 <br /> <br />Bridge Surveyor, North Halawa Valley Viaduct, Oahu, Hawaii. Member of design consultant field team <br />providing construction inspection services to HDOT for a cast-in-place post-tensioned concrete twin <br />viaduct 1.2 miles long, constructed segmentally in spans up to 360 feet. Carried out geometry control <br />inspections of segments before and after casting. Surveyed cantilevers partially built for comparison with <br />construction engineering stage cambered theoretical profiles and determined compliance with contract <br />geometry. Verified project control, traveler form setups and segment as built horizontal locations. Checked <br />layout of drilled shafts foundations, columns, bearing alignments, barrier, overlay profiles. <br /> <br />Project Engineer/Inspector, DeDiego Expressway, Barceloneta, Puerto Rico . For the Puerto Rico <br />Highway Authority,inspected construction of a pretensioned multi-beam concrete twin viaduct of 1.4 miles <br />and divided highway of 1.5 miles length. Administered contract requirements, attended meetings with <br />various contractor supervisors, trained and delegated duties of project inspectors. <br /> <br />Bridge Surveyor, Caguana River Bridge, Utuado, Puerto Rico. Provided construction survey services to <br />the Puerto Rico Highway authority for a post-tensioned concrete bridge constructed segmentally and <br />launched 1,270 feet into final position. Performed form checks and segment as built surveys for <br />construction stages and monitored launching alignment. Alternate duties included monitoring of post <br />tensioning, concrete placement operations and reporting to the resident engineer through project <br />completion and liquidation. <br /> <br />Bridge Inspector, 1-595/1-75 Interchange, Broward County. Inspected nine concrete bridges precast in <br />1,370 segments and erected in balanced cantilever. As member of design consultant team, provided <br />construction services to FDOT in precast yard. Primary duties were checking reinforcing steel placement <br />and monitoring post tensioning operations and overall quality assurance within the precast yard. <br /> <br />Senior Inspector, 1-95 and Interchange to Donald Ross Road, Palm Beach County. Carried out <br />inspection for FDOT on 4.1 miles of interstate highway and bridge construction. <br /> <br />Page3116 <br />