Laserfiche WebLink
<br />= <br />a <br />-- <br />. <br />- <br />'= <br />~ <br />E <br />. <br />.. <br />- <br />eel <br />... <br />= <br />CD <br />E <br />= <br />a <br />.. <br />.- <br />:II <br />= <br />CD <br />. <br />= <br />a <br />.- <br />... <br />- <br />- <br />a <br />E <br />~ <br />'= <br />. <br />= <br />a <br />- <br />... <br />~ <br />= <br />.. <br />1i5 <br />= <br />a <br />c.:t <br /> <br />\ <br />I <br /> <br />ATTACHMENT "A" <br /> <br />TIE IIIIIIP, llC <br /> <br />August 16. 2011 <br /> <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach. FL 33160 <br />(305) 792-1953 Phone <br />(305) 792-1605 Fax <br />Mtulloch@sibfl.net <br /> <br />Re: 16050 Collins Ave, 16100 Collins Ave, 215 Sunny Isles Blvd, 151 Sunny Isles Blvd <br />Sunny Isles Beach, FL 33160 <br /> <br />Under the terms and conditions of this Proposal by and between The BG Group, LLC (The BG Group) and City <br />of Sunny Isles Beach (Customer), The BG Group wlll provide all labor. material and supervision necessary to <br />complete the demolition and removal work described herein: <br /> <br />SCOPE OF WORK: <br /> <br />. Demolish and remove existing structures, including footings, foundations, asphalt pavement, <br />and trees. Property and asbestos surveys and permits included, as is temporary construction <br />fence around property and performance/payment bonds. Bid bond excluded as per Question 23 <br />of Addendum # 1. <br /> <br />Excludes <br />. Asbestos, backfill, seeding! sod, salvage, shoring, bracing, underpinning, pile extraction, tenant <br />refuse, and permanent fencing. <br /> <br />~16050 Collins Ave <br />../; 16100 Collins Ave <br />. 215 Sunny Isles Blvd <br />. 151 Sunny Isles Blvd <br /> <br />Proposal Amount: ($26,316.00) ~ <br />Proposal Amount: ($27,600.00) <br />Proposal Amount: ($46,000.00) <br />Proposal Amount: ($49.520.00) <br /> <br />Time to complete each demolition is two weeks from receipt of both NTP and permit. <br /> <br />Work by The BG Group: <br /> <br />2.1 The BG Group will verify all utilities that serviced the structures or equipment to be removed have <br />been disconnected prior to the start of any work. <br /> <br />The BG Group will remove, load, haul and legally dispose of all combustible. solid and metallic <br />debris resulting from the above captioned removal work. <br /> <br />Provide water supply in sufficient quantity and pressure and in close proximity to the removal site to <br />support all dust control and fire control measures necessary for the completion of the work. <br /> <br />1140 Hollald IriVe SIB 19 Baca RalOn. R 33481 561-998-1991 Fax: 561-998-8815 Email: Steperman@thebggroup.net <br /> <br />Sib <br />