My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-01 Design and Construction of Canopy at Heritage
>
Specifications
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 8:52:27 AM
Creation date
10/21/2011 8:52:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design and Construction of Canopy at Heritage Park
Bid No. (xx-xx-xx)
11-10-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />late Statement of Services for that month's billing cycle. A late Statement of Services with a <br />recommendation for payment will be paid in the next month's billing cycle. <br /> <br />The City shall process payment NO LATER THAN 20 business days of submission of proper <br />documentation (not the date of the invoice). This is the date when the City representative <br />acknowledges that the proposer has provided all necessary documentation to justify payment. <br />Documentation shall include but shall not be limited to ORIGINAL partial and final releases of <br />lien, Original Contractor's affidavit of partial and final releases of lien, an Original invoice on an <br />acceptable form approved by the City representative (AlA forms are Required), and other <br />documentation required by the City for processing of payment. <br /> <br />All payments, excluding final payment, shall be reduced by a 10% retainage to be paid at close- <br />out and final. This project requires that all payment include original releases of lien from all <br />vendors. <br /> <br />2.11 LABOR. MATERIALS. AND EQUIPMENT SHALL BE SUPPLIED BY THE PROPOSER <br /> <br />Unless otherwise provided in Section 3 of this solicitation the proposer shall furnish the following, <br />including but not limited to, all labor, material, equipment, barricading, adequate supervision, <br />and coordination for satisfactory contract performance. When not specifically identified in the <br />technical specifications, such materials and equipment shall be of a suitable type and grade for <br />the purpose. All material, workmanship, 100% design, testing and equipment shall be subject to <br />the inspection and approval of the City's Project Manager. <br /> <br />2.12 CLEAN-UP <br /> <br />All unusable materials and debris shall be removed from the premises at the end of each <br />workday, and disposed of in an appropriate manner. Upon final completion, the proposer shall <br />thoroughly clean up all areas where work has been involved as mutually agreed with the <br />associated user department's project manager. <br /> <br />2.13 FEDERAL. STATE AND LOCAL REGULATIONS <br /> <br />The successful Proposer shall comply with all federal, state and local ordinances, regulations, and <br />rules as well as any other laws that would apply to the design and installation of the canopy <br />structure at Heritage Park and Golden Shores Park. The proposer's costs associated with <br />regulatory requirements shall be included in the project cost whether depicted specifically or not <br />within the body of the proposal. <br /> <br />2.14 MATERIALS SHALL BE NEW AND WARRANTED AGAINST DEFECTS <br /> <br />The proposer hereby acknowledges and agrees that all materials, except where recycled content <br />is specifically requested, supplied by the proposer in conjunction with this solicitation and <br />resultant contract shall be new, warranted for their merchantability, and fit for a particular <br />purpose. In the event any of the materials supplied to the City by the proposer are found to be <br />defective or do not conform to specifications: (1) the materials may be returned to the proposer <br />at the proposer's expense and the contract cancelled or (2) the City may require the proposer to <br />replace the materials at the proposer's expense. <br /> <br />In the event that material is suspected by the City Representative of being reused or not new in <br />original packaging, the material may be rejected. The Proposer shall remove such material and <br />replace it at his/her cost and within the original schedule. No provisions or allotments for delays <br /> <br />PAGE 14 OF 33 <br />BID No. 11-10-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.