My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-02 Design, Permitting, Fabrication and Inst. of Barrier at Heritage
>
Addendum No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 11:59:58 AM
Creation date
11/15/2011 11:59:47 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design Aluminum Security Barrier
Bid No. (xx-xx-xx)
11-10-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5.2 The amount of adjustment in the contract price for authorized Change Orders will be agreed upon <br />before such Change Orders becomes effective and will be determined as follows: <br /> <br />5.2.1 By an acceptable unit price or lump sum proposal from the Contractor and the Subcontractors of <br />any tier. Breakdowns shall be of sufficient detail to allow evaluation by the City and include a <br />listing of each item of material with unit prices and number of hours of labor for each task. For <br />Subcontracted work, all cost information and breakdowns must be submitted on Subcontractor's <br />company letterhead for the review of the City. The total cost of the change order must reflect <br />each task or subcontracted work and be provided on the Contractor's letterhead. All attachments <br />must be included to be considered. <br /> <br />5.2.2 By a time and material basis with or without a specified maximum, including all overhead and <br />profit, total cost not to exceed maximum specified. The City's Representative will approve daily <br />the Contractor's time and material for the Work. Time must be submitted on daily time sheets. <br />Hourly rates must be negotiated prior to commencement of work. <br /> <br />5.3 Overhead and profit on Change Orders shall be applied as follows: <br /> <br />5.3.1 The overhead and profit charged by the Contractor shall be considered to include, but not <br />limited to, performance and payment bond, job site office expense, normal hand tools, <br />incidental job supervision, field supervision, company benefits, general office overhead, <br />and other incidentals. The percentages for overhead and profit charged on Change <br />Orders shall be negotiated and may vary according to the nature, extent, and complexity <br />of the Work involved but in no case shall exceed the following: <br /> <br />Overhead and Profit <br />Not to exceed 12% combined (specific percentage will be negotiated at the time of <br />request) <br /> <br />Not more than three mark-ups, not to exceed individual maximums shown above, shall <br />be allowed regardless of the number of tier subcontractors. Overhead and profit shall be <br />shown separately for each subcontractor of any tier and the Contractor. <br /> <br />5.3.2 On proposals covering both increases and decreases in the amount of the Contract, the <br />application of overhead and profit shall be on the net change in direct cost for the <br />Contractor or Subcontractor of any tier performing the Work. <br /> <br />5.4 The contractor shall provide Change Order pricing and backup in a timely manner. No claim for <br />an addition to the Contract sum will be valid unless authorized in writing by the City. <br /> <br />5.5 No changes or additions to work to be performed, materials to be furnished, or in the provisions of <br />the Contract will be authorized until execution and delivery by the City to the Contractor of the <br />written order referred to in this paragraph. Any work completed by the Contractor outside the <br />original project scope without written approval from the City will be deemed as a waiver by the <br />Contractor for additional compensation for said work. <br /> <br />5.6 If the Contractor asserts that any instructions, information, event or occurrence has caused a <br />change in or addition to the Work which change causes an increase or decrease in the <br />Contractor's cost or time required for the performance of any part of the Work under the Contract, <br />the Contractor shall give the City written notice before conditions are disturbed and before <br />proceeding to execute the Work. Contractor's notice shall be given promptly enough to avoid <br />delaying the Work and in no instance later than seventy two hours after such instructions, <br />information, event or occurrence has caused a change. If the City agrees that the Work involved <br />is extra Work, a Change Order shall be issued as provided in this Article. No claims for extra <br />Work shall be allowed unless the notice required by this Article is given by the Contractor within <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.