My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-01 Design and Construction of Canopy at Heritage
>
Addendum No. 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 12:07:41 PM
Creation date
11/15/2011 12:07:41 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3.2.7 The Contractor shall be responsible for all shoring required to protect its work or adjacent <br />property and shall pay for any damage causeu by failure to shore or by improper shoring <br />or by failure to give proper notice. Shoring shall be removed only after completion of <br />permanent supports. <br /> <br />3.2.8 The Contractor shall maintain at his own cost and expense, adequate, safe and sufficient <br />walkways, platforms, scaffolds, ladders, hoists and all necessary, proper, and adequate <br />equipment, apparatus, and appliances useful in carrying on the Work and which are <br />necessary to make the place of Work safe and free from,avoidable danger, and as may <br />be required by safety provisions of applicable laws, ordinances, rules regulations and <br />building and construction codes. <br /> <br />3.2.9 During the performance of the Work, the Contractor shall be responsible for providing <br />and maintaining warning signs, lights, signal devices, barricades, guard rails, fences, and <br />other devices appropriately located on site which shall give proper and understandable <br />warning to all persons of danger of entry onto land, structure, or equipment. <br /> <br />3.2.10 The Contractor shall be responsible for care of the Work and must protect same from <br />damage of defacement until acceptance by the City. All damaged or defaced Work shall <br />be repaired or replaced to the City's satisfaction, without cost to the City. <br /> <br />3.2.11 When requested by the City's Representative, the Contractor, at no extra charge, shall <br />provide scaffolds or ladders in place as may' be' required by the AlE or the City for <br />examination of Work in progress or completed. <br /> <br />3.2.12 The Contractor shall be responsible to the City for acts and omissions of the Contractor's <br />employees, Subcontractors of any tier and their agents and employees, and any entity or <br />other persons performing portions of the Work. <br /> <br />3.2.13 The Contractor shall not be relieved of its obligations to perform the Work in accordance <br />with the Contract Documents either by activities or duties of the City's Representative or <br />AlE in their administration of the Contract, or by tests, inspections or approvals required <br />or performed by persons other than the Contractor. <br /> <br />3.2.14 The Contractor shall be responsible for inspection of -portions of the Work already <br />performed under this Contract to determine that such portions are in proper condition to <br />receive subsequent Work. <br /> <br />3.2.15 Job site safety is the responsibility of the Contractor. Any costs associated with providing <br />a safe construction site, including staging are.3S, per all State, Federal, City and OSHA <br />regulations are included in the bid price submitted. <br /> <br />The Contractor shall take all reasonable precautions for the safety of, and shall provide <br />all reasonable protection to prevent damage, injury or loss to: <br /> <br />. all employees on the Work and all other persons who may be affected thereby; <br /> <br />. all the Work and all materials and equ;pment to be incorporated therein, whether <br />in storage on or off the site, under the care, custody or control of the Contractor <br />or any of his Subcontractors or Sub subcontractors, machinery, equipment and <br />all hazards shall be guarded or elin Iinated in accordance with all applicable <br />safety regulations; and <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.