My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-01 Design and Construction of Canopy at Heritage
>
Addendum No. 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 12:07:41 PM
Creation date
11/15/2011 12:07:41 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />spatial relationships of all work. Any question concerning said 10Gationor 'spatial <br />relationships shall be submitted to the City's Representative. Specific, locations for <br />equipment, pipelines, ductwork and other such items of work, where not dimensioned on <br />plans, shall be determined in consultation with City's Representative and AlE. Contractor <br />shall be responsible for the proper fitting of the Work in place. <br /> <br />3.4.3 Should the Contract Documents fail to particularly describe materials or goods to be <br />used, it shall be the duty of the Contractor to inquire of the AlE and the City's <br />Representative what is to be used and to supply it at the Contractor's :;xpense,or else <br />thereafter replace it to the City's Representative's satisfaction. At a, minimum, the <br />Contractor shall provide the quality of materials as generally specified .throughout the <br />Contract Documents. <br /> <br />3.4.4 Contractor shall not be entitled to an adjustment in the Contract time or an adjustment in <br />the Contract Sum if a change or Work is required due to an error, inconsistency, omission <br />or violation that the Contractor failed to timely report. <br /> <br />3.4.5 Contractor shall be responsible for inspection of portions of Work already performed <br />under Contract to determine that such portions are in proper cond:tion., to receive <br />subsequent Work. <br /> <br />3.5 Cleaning and Removal <br /> <br />3.5.1 The Contractor shall keep the Work site and surrounding areas free fron,'accumulation of <br />waste materials, rubbish, debris, and dirt resulting from the Work and shall clean the <br />Work site and surrounding areas as requested by the AlE and the City'!': Representative, <br />including mowing of grass greater than 6 inches high. The Contractor; shall be <br />responsible for the cost of clean up and removal of debris from premL~es. The building <br />and premises shall be kept clean, safe, in a workmanlike manner, and in compliance with <br />OSHA standards at all times. At completion of the Work, the Contractor shall remove <br />from and about the Work site tools, construction equipment, machinery; fencing, and <br />surplus materials. Further, at the completion of the work, all dirt, stairs, and smudges <br />shall be removed from every part of the building, all glass in doors and 'iVtndows shall be <br />washed, and entire Work shall be left broom clean in a finished state ready for <br />occupancy. The Contractor shall advise his Subcontractors of any tier of this provision, <br />and the Contractor shall be fully responsible for leaving the premises ir. a finished state <br />ready for use to the satisfaction of the City's Representative. If the Cantractor fails to <br />comply with the provisions of this paragraph, the City may do so and, the cosLthereof <br />shall be charged to the Contractor. <br /> <br />3.6 <br /> <br />Materials, Labor, and Workmanship <br /> <br />3.6.1 Materials and equipment incorporated into the Work shall strictly conform to the Contract <br />Documents and representations and approved Samples provided by Contfactor and shall <br />be of the most suitable grade of their respective kinds for their respectivd uses;'and shall <br />be fit and sufficient for the purpose intended, merchantable, of good n9W material and <br />workmanship, and free from defect. Workmanship shall be in accordance with the highest <br />standard in the industry and free from defect in strict accordance with the . Contract <br />Documents. <br /> <br />3.6.2 Materials and fixtures shall be new and of latest design unless otherwise:specified, and <br />shall provide the most efficient operating and maintenance costs to th.:: City;" All Work <br />shall be performed by competent workers and shall be of best quality. <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.