My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-01 Design and Construction of Canopy at Heritage
>
Addendum No. 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 12:07:41 PM
Creation date
11/15/2011 12:07:41 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />sizes, dimensi(l!1s, performance characteristics, capacities, wiring diagrams and <br />controls, and dil other pertinent information. Four (4) copies of reviewed <br />submissions will Be returned to the Contractor. <br />. For all other shop drawings, submit one (1) legible, unfolded, reproducible, <br />transparencies .3nd five (5) opaque prints for each drawing. Each drawing shall <br />have a clear 3pace for stamps. When phrase "by others" appears on shop <br />drawings, the Contractor shall indicate on the drawing who is to furnish material <br />or operations so marked before submittal. <br /> <br />. The Contractor shall submit samples in triplicate of adequate size showing <br />quality, type, COlor range, finish and texture, unless otherwise specified. <br /> <br />. Where the technical specifications call for the submittal of manufacturer's data or <br />any other information to the City for information only, such Submittals shall be <br />made before the' commencement of any portion of the Work requiring such <br />submission. Four (4) copies shall be submitted and one (1) will be returned to <br />the Contractor. <br /> <br />. For use of all ~rades, the Contractor shall provide such number of prints as are <br />required for field distribution. All communications and transactions with <br />manufacturers or Subcontractors shall be through the Contractor. Where <br />specifications require manufacturer's printed installation instructions, the <br />Contractor shall submit copies of such instructions for review. Where several <br />materials are specified by' name for one use, select for use any of those so <br />specified. Whenever item or class of material is specified exclusively by trade <br />name, manufar.tur.er's name, or by catalog reference, use only such item, unless <br />written approv21 for substitution is secured. <br /> <br />. No portion of the Work requiring submission of Submittals shall be commenced <br />or fabricated by the Contractor except at the Contractor's own risk, until the <br />Submittal has !::'~en reviewed by the City. All such portions of the Work shall be <br />in accordance v,rith reviewed Submittals. <br /> <br />. By approving and submitting Shop Drawings, Product Data, Manuals and <br />Samples, etc. tile Contractor represents that the Contractor has determined and <br />verified all mat8,'ials, field measurements, and field construction criteria and that <br />the Contractor has checked and coordinated the information contained within <br />such submittal!- with the. requirements of the Work and of the Contract <br />Documents. The Contractor shall adhere to any supplementary processing and <br />scheduling instt uctions pertaining to Shop Drawings, which may be issued by the <br />City. <br /> <br />. Parts and deta:isnot fully indicated on the contract drawings shall be detailed by <br />the Contractor in accordance with standard engineering practice. Dimensions on <br />the Contract Drawings, as' well as detailed drawings themselves are subject in <br />every case to measurements of existing, adjacent, incorporated and completed <br />work, which shall be taken by the Contractor before undertaking any work <br />dependent on sdch data. <br /> <br />3.8.6 By approving and submitting signed and sealed Shop Drawings, Product Data, Samples <br />and similar submittals, the Contractor represents such Submittals strictly comply with the <br />requirements of the Ccmtract Documents and that the Contractor has determined and <br />verified field measurem,mts and field construction criteria related thereto, that materials <br />are fit for their intend8d use and that the fabrication, shipping, handling, storage, <br />assembly and installation of all materials, systems and equipment are in accordance with <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.