Laserfiche WebLink
<br />~=~ <br /> <br />Kimley-Horn <br />and Associates, Inc. <br /> <br />Mr. Jorge Vera, April 25. 2011, Page 4 <br /> <br />Table 1 provides a summary of the existing and future intersection and approach <br />delay (in seconds), level of service, and maximum volume-to-capacity ratio for <br />the AM and PM peak periods for both the weekday and Saturday. The City is <br />considering converting the existing eastbound approach, which consists of a <br />shared left-through and an exclusive right-turn lane into, to an exclusive left turn <br />lane and a shared left-through-right turn lane. The change in geometry will <br />require the eastbound and westbound approaches to operate as split phased. The <br />existing cycle lengths and northbound I southbound splits were not changed. The <br />future conditions analysis reflects the proposed geometry and phasing changes. <br /> <br /> T ABLl 1 <br /> COlLINS AVENUE AT 183RD STRUT <br /> INTERSECTION CAPACITY ANAL YSIS SUMMARY <br /> Exlstlnll Conditions Future Conditions <br />Analysis Period IntersectIon Intersection vie Intersection Intersection VIC <br />ADoroaeh Delav rseel LOS Ratio Delav rseel LOS Ratio <br />Weekday AM Peak Hour 18.4 B 0.67 17.7 B 0.62 <br />Eastbound Approach 57.8 E 0.88 54.3 D 0.79 <br />Westbound Approach 36.3 D 0.01 60.3 E 0.10 <br />Northbound Approach 11.8 B 0.62 11.5 B 0.61 <br />Southbound Approach 15.2 B 0.62 15.0 B 0.62 <br />Weekday PM Peak Hour 20.6 C 0.87 19.7 B 0.73 <br />Eastbound Approach 79.9 E 0.92 70.3 E 0.78 <br />Westbound Approach 49.8 D 0.01 77.9 E 0.19 <br />Northbound Approach 16.5 B 0.88 14.8 B 0.7S <br />Southbound Approach 15.3 B 0.65 16.4 B 0.67 <br />Saturday AM Peak Hour 13.6 B 058 13.3 B 0.52 <br />Eastbound Approach 54.1 D 0.78 55.5 E 0.72 <br />Westbound Approach 40.5 D 0.02 64.2 E 0.29 <br />Northbound Approach 8.8 A 0.51 8.5 A 0.51 <br />Southbound Approach 11.2 B 0.51 10.8 B 0.52 <br />Saturday PM Peak Hour 15.6 B 0.68 15.9 B 0.66 <br />Eastbound Approach 53.6 D 0.79 55.9 E 0.76 <br />Westbound Approach 40.0 D 0.01 61.9 E 0.19 <br />Northbound Approach 11.6 B 0.67 11.7 B 0.67 <br />Southbound Approach 13.2 B 0.59 13.2 B 0.59 <br /> <br />Note: The future conditions analysis reflects the proposed geometry and phasing changes, <br /> <br />Based on the intersection capacity analysis summarized in Table 1, the <br />intersection is expected to operate at an acceptable level of service for both <br />existing conditions and future conditions. For all analysis periods, the <br />intersection is expected to operate at the existing level of service with the <br />modification to the dri vewa y on 183 rd Street. <br /> <br />Summary <br /> <br />Based on the analysis, the intersection of Collins Avenue and 183rd Street will <br />operate at the existing level of service, or better, with the driveway modification <br />on 183rd Street. The geometry changes for the eastbound approach at Collins <br />Avenue and I 83rd Street will require a four section signal head for the inside lane. <br />