My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1817
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2012 11:41:40 AM
Creation date
12/21/2011 2:46:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1817
Date (mm/dd/yyyy)
12/15/2011
Description
RFQ 11-07-01 Agmt Calvin Giordano Permit Srvs for Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH <br /> <br />Sunny Isles Beach Bridge Permitting & Resident Meetings <br />PROJECT DESCRIPTION <br /> <br />1. SCOPE OF SERVICES <br /> <br />Calvin, Giordano & Associates, Inc. will perform the following services based on our <br />understanding of the project requirements: <br /> <br />I. Professional Engineering Services <br /> <br />A. Electrical Engineering <br /> <br />1. Develop lighting layout and perform photometric calculations for <br />North Bay Road Bridge. <br /> <br />2. Coordinate with FPL to establish electric service. <br /> <br />3. Provide electrical engineering design services for electric service, <br />service, power distribution, branch circuits and controls for street <br />lighting between NE 172nd Street and NE I 74th Street including the <br />North Bay Road bridge. <br /> <br />4. Provide electrical engineering services during construction including <br />responses to RFIs, review of shop drawings, periodic inspection, and <br />final inspection. <br /> <br />B. Civil Engineering <br /> <br />1. Prepare surface water drainage plans for pedestrian bridge sufficient <br />for permitting and construction <br /> <br />2. Prepare surface water drainage calculations for pedestrian bridge <br />sufficient for permitting through Miami-Dade DERM <br /> <br />3. Coordinate geotechnical sub-consultant percolation tests <br /> <br />4. Prepare and process SWM permit applications through Miami-Dade <br />DERM (This only includes the drainage/surface water management <br />related issues and not the environmental issues). <br /> <br />,(~ <br />",\ ;,' r~\ <br />" " ~ ~ <br /><r,J ~ k"l~ <br />.. ~~ttl <br />
The URL can be used to link to this page
Your browser does not support the video tag.