Laserfiche WebLink
<br />Dependant on the findings, we will make a recommendation or recommendations to <br />proceed with a solution to the flooding problem being experienced in the identified area. <br />For example, if we determine that the existing drainage inlets are interconnected with <br />piping and a positive outfall which are not working due to silt and debris clogging the <br />pipes, we will recommend maintenance to clear the pipes and relieve the flooding. If we <br />determine that a piping system does not exist and the area relies on an exfiltration <br />trench system which is clogged due to age and lack of maintenance, we may <br />recommend cleaning/rehabilitation of the system or installation of a new system. The <br />cost to identify possible solutions, make a recommendation and provide a <br />conceptual/preliminary design solution will be $2,500.00. <br /> <br />Total Cost for Phase 1 <br /> <br />$9.000.00 <br /> <br />Phase 2 <br />In an effort to provide you with some estimated costs associated with the solution to this <br />flooding problem, CAS is providing below some possible solutions and estimated <br />engineering and permitting costs associated with them. <br /> <br />Option 1 - Cleaning/rehabilitation of existing storm drain system (1900LF). <br />Engineering fee for coordination and direction to contractor-$2,500.00 <br /> <br />Option 2 - Cleaninglrehabilitation of existing exfiltration system. <br />Engineering fee for coordination and direction to contractor-$500.00 <br /> <br />Option 3 - Installation of exfiltration trench (200 LF) <br />Engineering fee to design and permit (incl. $1,000 for exfiltration test)- $4,000.00 <br /> <br />Option 4 - Connection to existing FOOT drainage system. <br />Engineering fee to design and permit - $8,000.00 <br /> <br />Option 5 - Construction of Storm Drainage Pipe System with outfall. <br />Engineering fee to design and permit - $25,000.00. <br /> <br />Phase 3 <br />In an effort to provide you with some estimated costs associated with the solution to this <br />flooding problem, CAS is providing below some possible solutions and estimated <br />bidding and construction costs associated with them. <br /> <br />Page 2 of 3 <br /> <br />..r.;' <br /> <br />C" .\ '\:.) <br /> <br />~....J <br />