My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Superior Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-12-02 City Wide Landscaping Services
>
Responses
>
Superior Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 11:33:03 PM
Creation date
1/10/2012 3:11:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Wide Landscape
Bid No. (xx-xx-xx)
11-12-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V/4 of SoN fir! <br />NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he /she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL TOTAL <br />C. EQUIPMENT <br />C1 <br />One Front End Loader with Backhoe, <br />250 Hours <br />X <br />0• L90 <br />CA <br />500 <br />including an Operator <br />Per Hour = <br />X $ � <br />$ <br />C2 <br />One Front End Loader with Backhoe, <br />including an Operator <br />30 Days <br />Y <br />34 <br />( p $oa <br />Per Da = <br />X $ <br />$ <br />C3 <br />One Front End Loader with Backhoe, <br />4 Weeks <br />c1� Q� <br />1, <br />oC <br />71 ©� <br />including an Operator <br />v <br />o� <br />Per Week = <br />X $ <br />$ 010 <br />C4 <br />One Front End Loader with Backhoe, <br />1 Month <br />7 q � . eo <br />7 q eo <br />including an Operator <br />1 <br />1 <br />Per Month = <br />X $ <br />$ <br />C5 <br />One 15,000 GVW (or larger) Dump Truck <br />100 Hours <br />• 00 <br />cj 060 <br />with an Operator <br />Per Hour = <br />X $ <br />$ <br />C6 <br />One 15,000 GVW (or larger) Dump Truck <br />10 Days <br />oZ • �� <br />�� a Q� 0 <br />with an Operator <br />Per Day = <br />X $ <br />$ <br />C� <br />One 15000 GVW (or larger) Dump Truck <br />, <br />with an Operator <br />i Week <br />�- Qd <br />a/ <br />a, <br />Per Week = <br />X $ <br />$ 010 <br />C8 <br />One 15,000 GVW (or larger) Dump Truck <br />with an Operator <br />1 Month <br />4 200, ©� <br />11go ) <br />i <br />City of Sunny Isles Beach I Request for Proposal No. 11 -12 -02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.