Laserfiche WebLink
SCHEDULE AND WORKPLAN <br />For <br />DESIGN AND CONSTRUCTION OF CANOPY <br />STRUCTURES AT HERITAGE AND GOLDEN SHORES <br />PARK <br />Task Name <br />Duration <br />NTP <br />1 Day <br />Meet with City Confirm to Design <br />5 Days <br />Receive Engineered Drawings <br />21 Days <br />Permit Review <br />30 Days <br />Submittals <br />20 Days <br />Fabricate Structures <br />45 Days <br />Install Structures <br />15 Days <br />Fabricate Sails <br />14 Days <br />Repair PIP and Brick Pavers <br />5 Days <br />Install Shade Sails <br />3 Days <br />Close Out <br />30 Days <br />RFP # NO. 11 -10 -01 <br />Design & Construction of Canopy Structures at <br />Heritage Park and Golden Shores Park <br />City of Sunny Isles Beach <br />Page 40 <br />