Laserfiche WebLink
I <br />PROJECT INFORMATION <br />R. Welding procedures shall ccrnp4- it accordaue with dte AW a 111.1 AU'S <br />Sfruchual Welding Code- Steel, <br />O. All welds to be performed by a certified welder. All welds sbail be continuo us where <br />length ii not 1#vu unless othenAse stiown of noted on thawing_ <br />i1_ All welds shall dnvdop the full strength of the weak er member. All welds ba <br />be mate using VOW.. . D35 lain. <br />E_ Uwp coLne Lions shall be welded unless.nvied affie ASe. Field connectiom shall <br />t+Eb > rdic�ted c� tlae drag R – welded connections ;are not acceptable. <br />F. All fillet welch shall be a Tnininntm of'• "unless otherwise netted. <br />G_ All steel shall be welded shm at termiraticns- to pte%wt interral leakage. <br />IL Interml weld slexecing is c-c+t acceptable_ <br />1< On -site weldir4 of any component is not acceptable. <br />LU MMMiG <br />A. Ct site sewer of a fabaic will not be accepted. <br />R. All corners, :shall be reinkmed with evn non -tw cloth and stray, to distribute The <br />load- <br />C. The peace tens, that contain the cables tMU be double loch stitched. <br />L07 WSTALLATIDN HARDWARE <br />A. Salt and fawn ng hardware shall be detamirredbaied or calculated <br />engineering loa& <br />B. All bolts Iliall comply with SAE J429 {Grade cr A.STM A325 (Grade BD). All <br />ruts . complyurithAUMF-1594, alb Group 1 w 2. <br />G. Wiverope cable shall be 7x19 stand gahanized -wire rope with a brealdngstrength <br />of 7,00D N. CIA— diameter) fx ihrdei generaliyumder 308 sq..&- unless requested <br />lar,ger by the customer_ Fba sbades >3C0 sq. ft. cable shall be 5116"(499W breaking <br />strengths For special vwintly card dons, cable slsternmaybe up- siaediby eneineerim f <br />- AD litti ngs required forpaager securing of the cable are hot dipped galvanized. <br />"All Connectors and Washers will be stainless steel where required " <br />MO <br />A. Carcrete work shall be e:recuted is accordance with the latest edition of <br />RFP # NO. 11 -10 -01 <br />Design & Construction of Canopy Structures at <br />Heritage Park and Golden Shores Park <br />City of Sunny Isles Beach <br />Page 51 <br />