My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid No. 16-12-02 - New HVAC Chiller Systems for Pelican Community Park
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(16-12-02) HVAC Chiller Systems for Pelican Community Park
>
Bid No. 16-12-02 - New HVAC Chiller Systems for Pelican Community Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 4:26:01 PM
Creation date
2/15/2017 4:21:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
New HVAC Chiller Systems for PCP
Bid No. (xx-xx-xx)
16-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 27 <br /> <br />BID FORM 5 <br />BID PRICING <br /> <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS <br />INCLUDING ALL LABOR, EQUIPMENT, SUPERVISION, TESTING AND PERMITTING TO PROVIDE A <br />COMPLETE TURN-KEY PROJECT CONFORMING TO THE REQUIREMENTS DETAILED BY THE <br />SPECIFICATIONS, MANUFACTURER, OWNER, STATE, FEDERAL AND LOCAL AGENCIES FOR THE <br />FOLLOWING LUMP SUM AND/OR UNIT PRICES. WORK INCLUDES BUT IS NOT LIMITED TO <br />GENERAL, ELECTRICAL AND MECHANICAL CONSTRUCTION. <br />BID <br />ITEM # DESCRIPTION UNIT EST. <br />QUANTITY <br />UNIT <br />COST <br />EXTENDED <br />COST <br />Temporary Chiller System <br />1. <br />Temporary Chiller service required during the <br />replacement period of the existing chillers <br />(including installation, operation, and removal) <br />LS 1 $ $ <br /> Subtotal of Temporary Chiller System $ <br />Demolition of Existing HVAC Chiller Systems <br />2. Removal of existing modular Air Cooled Chiller LS 1 $ $ <br />3. Removal of existing Pumps LS 1 $ $ <br /> Subtotal of New HVAC Chiller Systems $ <br />New HVAC Chiller Systems <br />4. <br />New Chiller CH-1 (see schedule notes on M-2) to <br />installed on a new modified structural concrete <br />pad including but not limited too new two <br />alternate chilled water pumps, piping, and the <br />upgrade of the 200A service of existing panel to <br />a new 250A service new chiller load (see <br />schedule notes on E-1) <br />LS 1 $ $ <br /> Subtotal of New HVAC Chiller Systems $
The URL can be used to link to this page
Your browser does not support the video tag.